Removal of the Stop Bolts
TASK 52-31-31-000-001-A
Removal of the Stop Bolts
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 52-31-31-010-050-A
Subtask 52-31-31-020-050-A
[Rev.10 from 2021]
2026.04.01 12:45:31 UTC
Removal of the Stop Bolts
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 52-31-31-010-050-A
A. Get Access
(1) Open the FWD cargo-compartment door (referred to as cargo door) and safety it with the actuator safety locks (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the opened cargo door.
Subtask 52-31-31-865-053-A (1) Open the FWD cargo-compartment door (referred to as cargo door) and safety it with the actuator safety locks (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the opened cargo door.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | DOORS/CARGO | 1MJ | T12 |
Subtask 52-31-31-020-050-A
A. Removal of the Stop Bolts
(1) Release the tab washers (3) which safety the nuts (2).
(2) Loosen the nuts (2) and remove them with the stop bolts (1) and the tab washers (3).
(3) Discard the tab washers (3).
(1) Release the tab washers (3) which safety the nuts (2).
(2) Loosen the nuts (2) and remove them with the stop bolts (1) and the tab washers (3).
(3) Discard the tab washers (3).
Stop Bolts