Removal of the Lining and the Insulation
TASK 52-31-13-000-001-A
Removal of the Lining and the Insulation
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 52-31-13-010-050-A
Subtask 52-31-13-020-050-D
[Rev.10 from 2021]
2026.04.01 04:40:50 UTC
Removal of the Lining and the Insulation
CAUTION:
IMMEDIATELY AFTER YOU OPEN THE CARGO COMPARTMENT DOOR, RECORD ON THE WORK CARD ON THE DOOR, THE DATE AND TIME WHEN YOU OPENED IT. IF THE CARGO COMPARTMENT DOOR STAYS OPEN FOR 12 HOURS OR MORE, YOU MUST BLEED THE HYDRAULIC SYSTEM RELATED TO IT. IF YOU DO NOT OBEY THESE PRECAUTIONS, THE DOOR CAN CLOSE SUDDENLY WHEN YOU SET THE DOOR TO "CLOSE". THIS CAN CAUSE DAMAGE TO THE DOOR AND TO THE AIRCRAFT STRUCTURE.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 52-31-13-010-050-A
A. Get Access
(1) Open the FWD and/or AFT cargo-compartment door(s) (referred to as cargo door(s)) and install the actuator safety locks (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position.
Subtask 52-31-13-865-050-A (1) Open the FWD and/or AFT cargo-compartment door(s) (referred to as cargo door(s)) and install the actuator safety locks (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position.
B. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 122VU | DOORS/CARGO | 1MJ | T12 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
Subtask 52-31-13-020-050-D
A. Removal of the Protective Lining
(1) Release the quick-release fasteners (2) to disconnect the protective lining (3) from the cargo door (1).
(2) Carefully disengage the VELCRO tapes and remove the protective lining (3) together with the self-adhesive insulation from the cargo door (1).
(1) Release the quick-release fasteners (2) to disconnect the protective lining (3) from the cargo door (1).
(2) Carefully disengage the VELCRO tapes and remove the protective lining (3) together with the self-adhesive insulation from the cargo door (1).
Lining and Insulation