W DOC AIRBUS | AMM A320F

Remove APU for in shop Discard of Load Compressor Impeller


TASK 49-23-00-920-801-A
Remove APU for in shop Discard of Load Compressor Impeller


1. Reason for the Job
Refer to the MPD TASK: 492300-A1
REMOVE APU FOR IN SHOP DISCARD OF LOAD COMPRESSOR IMPELLER.

2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 49-11-11-000-003-A
Removal of the Power Plant (APU) (APS 3200)
TASK 49-11-11-400-003-A
Installation of the Power Plant (APU) (APS 3200)
3. Job Set-up
Subtask 49-23-00-010-050-A ** ON A/C NOT FOR ALL
A. Remove the Auxiliary Power Unit (APU) (Ref. AMM TASK 49-11-11-000-003).
4. Procedure
Subtask 49-23-00-020-050-A ** ON A/C NOT FOR ALL
A. Send the APU to the workshop.
5. Close-up
Subtask 49-23-00-410-050-A ** ON A/C NOT FOR ALL
A. Install the Auxiliary Power Unit (APU) (Ref. AMM TASK 49-11-11-400-003).