2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 46-26-32-861-073-A ** ON A/C NOT FOR ALL Subtask 46-26-32-480-053-A ** ON A/C NOT FOR ALL
Subtask 46-26-32-970-051-A ** ON A/C NOT FOR ALL
Subtask 46-26-32-410-066-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:08 UTC
Uploading of the Flight Operations and MAintenance eXchanger (FOMAX)
ZONE: 128
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| ALT45200001 | 1 | PORTABLE DATA LOADER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 128 | REAR AVIONIC COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 46-26-32-280-801-B | Check of the Flight Operations and MAintenance eXchanger (FOMAX) Configuration with the Portable Data Loader (PDL) |
Subtask 46-26-32-861-073-A ** ON A/C NOT FOR ALL Subtask 46-26-32-480-053-A ** ON A/C NOT FOR ALL
B. Installation of the Portable Data Loader (PDL):
(1) On the ALT45200001 PORTABLE DATA LOADER, make sure that the ON/OFF switch is in the OFF position.
(2) On center pedestal 11VU, on the front face of the Data Loading Selector Unit (DLSU):
(a) Remove the PDL plug cap from the data loader connector.
(b) Connect the cable to the ALT45200001 PORTABLE DATA LOADER and to the data loader connector.
Subtask 46-26-32-865-076-A ** ON A/C NOT FOR ALL (1) On the ALT45200001 PORTABLE DATA LOADER, make sure that the ON/OFF switch is in the OFF position.
(2) On center pedestal 11VU, on the front face of the Data Loading Selector Unit (DLSU):
(a) Remove the PDL plug cap from the data loader connector.
(b) Connect the cable to the ALT45200001 PORTABLE DATA LOADER and to the data loader connector.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 46-26-32-860-104-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | DATA/LOADER/SPLY | 3TD | J16 |
| 121VU | DLSU &/DLRB/SPLY | 5TD | J15 |
| 121VU | FOMAX | 67TA | J01 |
| 121VU | PDL/PWR/SPLY | 14TD | K19 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | PDL/PWR/SPLY | 14TD | J45 |
| 121VU | DATA/LOADER/SPLY | 3TD | J39 |
| 121VU | DLSU &/DLRB/SPLY | 5TD | J38 |
| 121VU | FOMAX | 67TA | R12 |
D. Start of the Portable Data Loader (PDL)
(1) Start the ALT45200001 PORTABLE DATA LOADER (for more information, refer to the PDL user guide).
Subtask 46-26-32-280-059-A ** ON A/C NOT FOR ALL 4. Procedure(1) Start the ALT45200001 PORTABLE DATA LOADER (for more information, refer to the PDL user guide).
Subtask 46-26-32-970-051-A ** ON A/C NOT FOR ALL
A. Uploading of the FOMAX Software with the Portable Data Loader (PDL)
Subtask 46-26-32-280-060-A ** ON A/C NOT FOR ALL NOTE: If the PDL has the digital signature check, it can send two messages:
- One message if the PDL detects that the software has no signature. You can ignore this message, it has no effect on the aircraft software uploading.
- One message if the PDL detects an incorrect signature. If this occurs, the software uploading is not possible and you must use a different software.
Because of data security, Airbus recommends that you send a report of the fault to the Aircraft Security Focal-Point.
| ACTION | RESULT |
|---|---|
| 1.Make sure that you have all the necessary media disks to do the uploading. | |
2.On center pedestal 11VU, on the Data Loading Selector Unit (DLSU):
| On the display of the DLSU, the indication that follows comes into view:
NOTE: The XXXXXXXXXX indication is the Part Number (PN) of the database software installed in the DLSU. Default value:'----------'. |
3.On center pedestal 11VU, on the DLSU:
| The DLSU does self-tests. |
| 4.Make sure that no error message comes into view. | On the display of the DLSU, the indication that follows comes into view:
|
5.On center pedestal 11VU, on the DLSU:
| On the display of the DLSU, the indication that follows comes into view:
|
6.On center pedestal 11VU, on the DLSU:
| On the display of the DLSU, the indication that follows comes into view:
NOTE: If no PDL is connected, the indication that follows comes into view: CONNECT PDL PUSH SEL. |
7.On the PDL:
NOTE: You can upload these last three software components independently if the FOMAX CORE software is uploaded. NOTE: The FOMAX can operate only when all the four software components are uploaded. NOTE: After each software installation, the FOMAX reboots automatically. NOTE: The uploading of the FOMAX CORE software erases the three software components related to the FOMAX CONFIGURATION DATA and the FOMAX CUSTOMIZATION DATA. If this occurs, it is necessary to upload the FOMAX CONFIGURATION DATA software (64TASW2), the A/L FOMAX CUSTOMIZATION DATA software (64TASW3) and the AIRBUS FOMAX CUSTOMIZATION DATA software (64TASW4) again. | |
8.When the uploading is completed, on center pedestal 11VU, on the DLSU:
| On the display of the DLSU, the indication that follows comes into view:
|
B. Check of Correct Data Transfer
(1) On the PDL, do the initialization procedure (for more information, refer to the PDL user guide).
(2) On the PDL, the Functional Item Numbers (FIN) and the PNs of the FOMAX hardware and FOMAX software come into view.
(3) Make sure that the PNs shown on the PDL are the same as the PNs that you recorded.
(4) On center pedestal 11VU, on the DLSU, set the ON/OFF switch to OFF.
Subtask 46-26-32-280-060-B ** ON A/C NOT FOR ALL (1) On the PDL, do the initialization procedure (for more information, refer to the PDL user guide).
(2) On the PDL, the Functional Item Numbers (FIN) and the PNs of the FOMAX hardware and FOMAX software come into view.
(3) Make sure that the PNs shown on the PDL are the same as the PNs that you recorded.
(4) On center pedestal 11VU, on the DLSU, set the ON/OFF switch to OFF.
B. Check for the Correct Data Transfer
(1) In the cockpit, start the Multipurpose Control and Display Unit (MCDU) 1 or 2.
(3) Do a check of the PNs loaded in the FOMAX:
(4) Decrease the brightness of the MCDU and stop MCDU 1 or MCDU 2.
Subtask 46-26-32-860-105-A ** ON A/C NOT FOR ALL (1) In the cockpit, start the Multipurpose Control and Display Unit (MCDU) 1 or 2.
NOTE: The procedure that follows is applicable to MCDU 1 or MCDU 2. The actions and the results of this procedure occur on the MCDU that you use.
(2) Adjust the brightness of the MCDU screen. (3) Do a check of the PNs loaded in the FOMAX:
| ACTION | RESULT |
|---|---|
1.On the MCDU:
| On the MCDU:
|
2.On the MCDU:
| On the MCDU:
|
3.On the MCDU:
| On the MCDU:
|
4.On the MCDU:
| On the MCDU:
|
5.On the MCDU:
| On the MCDU, on the AVIONICS CONFIG REPORT page, the indication that follows comes into view:
|
| Wait until the Centralized Fault Display Interface Unit (CFDIU) calculates the Avionics Communication Router (ACR) for the FOMAX. | On the MCDU, on the AVIONICS CONFIG REPORT page, the indications that follow come into view:
|
6.On the MCDU, on the AVIONICS CONFIG REPORT page:
| On the MCDU, on the AVIONICS CONFIG REPORT page, the indications that follow come into view:
|
7.On the MCDU, on the AVIONICS CONFIG REPORT page:
| |
8.On center pedestal 11VU, on the DLSU:
| |
C. Stop the Portable Data Loader (PDL).
(1) Stop the ALT45200001 PORTABLE DATA LOADER (for more information, refer to the PDL user guide).
Subtask 46-26-32-080-053-A ** ON A/C NOT FOR ALL (1) Stop the ALT45200001 PORTABLE DATA LOADER (for more information, refer to the PDL user guide).
D. Removal of the Portable Data Loader (PDL)
(1) On center pedestal 11VU, on the front face of the DLSU:
(a) Disconnect the cable from the PDL and from the data loader connector.
(b) Install the PDL plug cap on the data loader connector.
5. Close-up(1) On center pedestal 11VU, on the front face of the DLSU:
(a) Disconnect the cable from the PDL and from the data loader connector.
(b) Install the PDL plug cap on the data loader connector.
Subtask 46-26-32-410-066-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 46-26-32-862-073-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.