Leak Check of the Components in the Air Supply System
TASK 38-41-00-790-001-A
Leak Check of the Components in the Air Supply System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
3. Job Set-up
Subtask 38-41-00-941-053-A
Subtask 38-41-00-790-050-A
Subtask 38-41-00-080-052-A
[Rev.10 from 2021]
2026.04.01 04:50:14 UTC
Leak Check of the Components in the Air Supply System
NOTE: You can use the bleed air supply as an alternative to the ground air supply to do the leak check.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | 1 | GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) |
| REFERENCE | DESIGNATION |
|---|---|
| No specific | soap solution |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 171AL |
Subtask 38-41-00-941-053-A
A. Put the ACCESS PLATFORM 1M(3 FT) in position at Zone 171.
Subtask 38-41-00-010-055-A Subtask 38-41-00-480-053-A C. Connect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) to the ground air-pressure port.
4. ProcedureSubtask 38-41-00-790-050-A
A. Do the Leak Check
(1) Apply soap solution to the applicable connection(s).
(2) Operate the ground air-supply cart and pressurize the potable water system to 44 +3 psi or -3 psi (3.0337 +0.2068 bar or -0.2068 bar).
(3) Examine the connection(s) for leaks.
(5) Release the pressure from the potable water system.
5. Close-up(1) Apply soap solution to the applicable connection(s).
(2) Operate the ground air-supply cart and pressurize the potable water system to 44 +3 psi or -3 psi (3.0337 +0.2068 bar or -0.2068 bar).
(3) Examine the connection(s) for leaks.
NOTE: Leaks are not permitted.
(4) Clean the connection(s). (5) Release the pressure from the potable water system.
Subtask 38-41-00-080-052-A
A. Disconnect the ground air-supply cart.
Subtask 38-41-00-410-056-A B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the potable-water service panel-door 171AL.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the potable-water service panel-door 171AL.
NOTE: Make sure that the latches are correctly locked and that the door makes a continuous surface with the skin of the aircraft.
(3) Remove the access platform(s).