Stage 10 Air Solenoid Valve - P3 Servo Line Purging Procedure
TASK 36-11-57-280-010-A
Stage 10 Air Solenoid Valve - P3 Servo Line Purging Procedure
This task provides a purging procedure for the Cabin Air (HPC 10th stage bleed) Solenoid Valve P3 servo line.
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 36-11-57-941-052-A ** ON A/C NOT FOR ALL
Subtask 36-11-57-020-052-A ** ON A/C NOT FOR ALL
Subtask 36-11-57-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:14:03 UTC
Stage 10 Air Solenoid Valve - P3 Servo Line Purging Procedure
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
1. Reason for the JobThis task provides a purging procedure for the Cabin Air (HPC 10th stage bleed) Solenoid Valve P3 servo line.
NOTE: The illustrations attached to this procedure show the solenoid removed from the mounting bracket. This is for clarity purposes only. There is no need to remove the valve during this procedure.
NOTE: If a nitrogen supply is not available, clean dry air is permitted.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | FILLING EQUIPMENT - NITROGEN, PRESSURE REGULATED GAGE |
| No specific | 1 | GROUND AIR SUPPLY NITROGEN - 45 PSI (3.1 BAR) |
| No specific | 1 | NUT - AS15702, SOLENOID SUPPLY LINE CONNECTOR |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 221 and 204 lbf.in (2.50 and 2.31 m.daN ) ![]() | |
| IAE2R19437 | 1 | TEST SET - BLEED VALVE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V02-126) | lockwire |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-23-11-911-013-A | General Torque Tightening Techniques |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
Subtask 36-11-57-941-052-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(2) On the AIR COND panel 30VU:
Subtask 36-11-57-010-052-A ** ON A/C NOT FOR ALL NOTE: This procedure requires a regulated GROUND AIR SUPPLY NITROGEN - 45 PSI (3.1 BAR) to be connected to the HPSOV NUT - AS15702, SOLENOID SUPPLY LINE CONNECTOR (Ref. AS 15702).
The IAE2R19437 TEST SET - BLEED VALVE contains an applicable connecting air hose but cannot supply sufficient flow to purge the HPSOV/PRV sense line. If the IAE2R19437 TEST SET - BLEED VALVE is not available, a custom-made air hose similar to the Test Set air hose can be used.
(1) Make sure that the engine 1(2) shut down occured not less than 5 minutes before you do this procedure. The IAE2R19437 TEST SET - BLEED VALVE contains an applicable connecting air hose but cannot supply sufficient flow to purge the HPSOV/PRV sense line. If the IAE2R19437 TEST SET - BLEED VALVE is not available, a custom-made air hose similar to the Test Set air hose can be used.
(2) On the AIR COND panel 30VU:
- Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on),
- Make sure that the APU BLEED pushbutton switch is released (the OFF legend is on),
- Put a WARNING NOTICE(S) to tell persons not to operate the pneumatic system.
- Put a WARNING NOTICE(S) to tell persons not to start the engine 1(2).
- Put a WARNING NOTICE(S) to tell persons not to pressurize the pneumatic system
- Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off,
- Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Open the fan cowls (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
4. Procedure(1) Open the fan cowls (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
Subtask 36-11-57-020-052-A ** ON A/C NOT FOR ALL
A. Disconnect the HPSOV Supply Line at the Solenoid and Main P3 Supply Line
(1) Cut, discard the lockwire and disconnect the HPSOV P3 supply line (1) at the connector (2).
(2) Disconnect the HPSOV P3 supply line (1) from the P3 supply line (5) at the connector (6).
Subtask 36-11-57-160-051-A ** ON A/C NOT FOR ALL (1) Cut, discard the lockwire and disconnect the HPSOV P3 supply line (1) at the connector (2).
(2) Disconnect the HPSOV P3 supply line (1) from the P3 supply line (5) at the connector (6).
B. Purge the P3 Servo Supply Line
(2) TORQUE the remote nitrogen supply (3) and the HPSOV P3 supply connector (2) to between 221 and 204 lbf.in (2.50 and 2.31 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(3) Purge the pipe with a nitrogen supply of 45 psi for one minute.
(4) Disconnect the remote nitrogen supply (3).
Subtask 36-11-57-420-051-A ** ON A/C NOT FOR ALL NOTE: Do not bend the pneumatic pipes to gain access. If required, release the supporting P-clips until the pipe can be moved without undue force.
(1) Connect the FILLING EQUIPMENT - NITROGEN, PRESSURE REGULATED GAGE (3) to the HPSOV solenoid supply line connector (Ref. AS15702) (2) TORQUE the remote nitrogen supply (3) and the HPSOV P3 supply connector (2) to between 221 and 204 lbf.in (2.50 and 2.31 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (3) Purge the pipe with a nitrogen supply of 45 psi for one minute.
(4) Disconnect the remote nitrogen supply (3).
C. Reconnect Engine Services
(1) Reconnect the solenoid P3 supply tube connector (2) to the solenoid valve (4).
(2) Reconnect the HPSOV supply line (1) to the main P3 supply line (5) at the connector (6).
(3) TORQUE the connectors (2) and (6) to between 221 and 204 lbf.in (2.50 and 2.31 m.daN )
.
(4) Wirelock the connectors (2) and (6) with lockwire (Material No.V02-126) .
(5) Re-secure any P-clips previously released in the vicinity of the solenoid.
5. Close-up(1) Reconnect the solenoid P3 supply tube connector (2) to the solenoid valve (4).
(2) Reconnect the HPSOV supply line (1) to the main P3 supply line (5) at the connector (6).
(3) TORQUE the connectors (2) and (6) to between 221 and 204 lbf.in (2.50 and 2.31 m.daN )
. (4) Wirelock the connectors (2) and (6) with lockwire (Material No.V02-126) .
(5) Re-secure any P-clips previously released in the vicinity of the solenoid.
Subtask 36-11-57-410-051-A ** ON A/C NOT FOR ALL
HPC Stage 10 Bleed Valve Solenoid