W DOC AIRBUS | AMM A320F

Installation of the Take Off Light


TASK 33-46-11-400-001-A
Installation of the Take Off Light


WARNING: WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU DO WORK ON THE LIGHT. THE LAMP IS PRESSURIZED AND AN EXPLOSION CAN OCCUR.
ZONE: 711
FIN: 7LR
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.75 and 0.6 m.daN (66.37 and 53.10 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
711
NOSE GEAR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 33-46-00-710-001-A
Operational Test of the Taxi and Take Off Lights
3. Job Set-up
Subtask 33-46-11-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/EXT LT/TAXI AND TAKE OFF/TO3LRW07
4. Procedure
Subtask 33-46-11-420-050-D
A. Installation of the Take Off Light
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) For the Light Emitting Diode (LED) take-off light:
     (a) Make sure that the lens retainer assembly of the LED take-off light is in the correct condition.
   (4) For the incandescent lamp or the alternative halogen-lamp assembly:
     (a) Make sure that the filament of the bulb and the lens of the optical unit are in the correct condition.
   (5) Make sure that the clamp is correctly installed.
   (6) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (2) and (3).
   (7) Put the light (6) in position in the lower fork of the support (1).
   (8) Install the screw (3) in the support (1).
   (9) Install the washer (4) and the nut (5).
   (10) TORQUE the nut (5) to between 0.75 and 0.6 m.daN (66.37 and 53.10 lbf.in ) T.
   (11) Turn the light (6) to the upper forks.
   (12) Install the screws (2) in the support (1).
   (13) Install the washers (10) and nuts (9).
   (14) TORQUE the nuts (9) to between 0.75 and 0.6 m.daN (66.37 and 53.10 lbf.in )
T.
   (15) Remove the blanking caps from the electrical connector (8) and the socket (7).
   (16) Make sure that the electrical connector (8) and the socket (7) are in the correct condition.
   (17) Connect the electrical connector (8) to the socket (7) and lock it.
Subtask 33-46-11-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/EXT LT/TAXI AND TAKE OFF/TO3LRW07
Subtask 33-46-11-710-051-A
5. Close-up
Subtask 33-46-11-942-050-A
A. Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.04.01 00:55:48 UTC