To Open the Spare-Seal Activating-Valve
TASK 32-11-13-860-002-A
To Open the Spare-Seal Activating-Valve
To activate the primary (lower) gland seals (to put the spare seal activating-valve to its initial position) after the gland seals replacement.
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 32-11-13-941-053-A
Subtask 32-11-13-860-053-A ** ON A/C NOT FOR ALL
Subtask 32-11-13-942-053-A
[Rev.10 from 2021]
2026.04.01 00:40:09 UTC
To Open the Spare-Seal Activating-Valve
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobTo activate the primary (lower) gland seals (to put the spare seal activating-valve to its initial position) after the gland seals replacement.
NOTE: It is possible to activate the primary (lower) seal again in seven days after the secondary seal is activated, to make sure that there is a leak.
If the primary seal is activated again and:
2. Job Set-up InformationIf the primary seal is activated again and:
- There is a leak found, activate the secondary (upper) seal again (Refer AMM task 32-11-13-860-001-A, To Close the Spare-Seal Activating-Valve).
- There is no leak found, no maintenance is necessary.
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 0.45 and 0.4 m.daN (39.82 and 35.40 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 731 | L.H MAIN GEAR |
| 741 | R.H MAIN GEAR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | CAP SCREW | AIPC 32-11-11-65-180 |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 32-11-13-941-053-A
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the landing gear.
4. Procedure(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the landing gear.
Subtask 32-11-13-860-053-A ** ON A/C NOT FOR ALL
A. To Open the Spare-Seal Activating-Valve
(2) To open the spare-seal activating-valve:
(4) Torque the cap screw (1) to between 0.45 and 0.4 m.daN (39.82 and 35.40 lbf.in )
.
(5) Safety the cap screw (1) with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
Subtask 32-11-13-860-053-B ** ON A/C NOT FOR ALL WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(1) Remove and discard the lockwire from the spindle (2) and the pin (3). (2) To open the spare-seal activating-valve:
- Use your hand to turn the spindle (2) counter-clockwise to its stop.
(4) Torque the cap screw (1) to between 0.45 and 0.4 m.daN (39.82 and 35.40 lbf.in )
. (5) Safety the cap screw (1) with
A. To Open the Spare-Seal Activating-Valve
(2) To open the spare-seal activating-valve:
14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - to the spare-seal activating-valve housing.
5. Close-upWARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(1) Remove and discard the lockwire from the stem valve (1). (2) To open the spare-seal activating-valve:
- Use your hand to turn the stem valve (1) counter-clockwise to its stop.
NOTE: The visual indicator on the spare-seal activating-valve changes from red to green.
(3) Safety the stem valve (1) with Subtask 32-11-13-942-053-A
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the safety barriers.
(3) Remove the WARNING NOTICE(S).
(4) Make a record in the aircraft log that the spare-seal activating-valve is open.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the safety barriers.
(3) Remove the WARNING NOTICE(S).
(4) Make a record in the aircraft log that the spare-seal activating-valve is open.
Spare-Seal Activating-Valve