W DOC AIRBUS | AMM A320F

Special Detailed Inspection of Main Landing Gear, Main Fitting, Sliding Tube, Upper Diaphragm Tube, Lower Bearing Housing, Upper and Lower Torque Links.....


TASK 32-11-00-220-014-A
Special Detailed Inspection of Main Landing Gear, Main Fitting, Sliding Tube, Upper Diaphragm Tube, Lower Bearing Housing, Upper and Lower Torque Links.....


ZONE: 731
ZONE: 741
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
731
L.H MAIN GEAR
741
R.H MAIN GEAR
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 32-11-11-000-001-A
Removal of the MLG Leg Assembly
TASK 32-11-11-400-001-A
Installation of the MLG Leg Assembly
3. Job Set-up
Subtask 32-11-00-020-052-A ** ON A/C NOT FOR ALL
A. Removal of the Equipment
   (1) Remove the applicable MLG (Ref. AMM TASK 32-11-11-000-001).
4. Procedure
Subtask 32-11-00-220-072-A ** ON A/C NOT FOR ALL
A. Special Detailed Inspection of Main Landing Gear, Main Fitting, Sliding Tube, Upper Diaphragm Tube, Lower Bearing Housing, Upper and Lower Torque Links Internal Surfaces (off aircraft)
   (1) Send the equipment to the workshop and refer to MPD Appendix 7.
5. Close-up
Subtask 32-11-00-420-052-A ** ON A/C NOT FOR ALL
A. Install the Equipment
   (1) Install the applicable MLG (Ref. AMM TASK 32-11-11-400-001).
[Rev.10 from 2021] 2026.04.01 00:39:46 UTC