W DOC AIRBUS | AMM A320F

Special Detailed Inspection of Main Landing Gear, Main Fitting comprising: - Main Fitting......


TASK 32-11-00-220-013-A
Special Detailed Inspection of Main Landing Gear, Main Fitting comprising: - Main Fitting......


ZONE: 731
ZONE: 741
1. Reason for the Job
Refer to the MPD TASK: 321141-01
SPECIAL DETAILED INSPECTION OF MAIN LANDING GEAR, MAIN FITTING COMPRISING:
- MAIN FITTING
- UPPER DIAPHRAGM TUBE
- SLIDING TUBE
- LOWER BEARING HOUSING (TWIN WHEEL)

2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
731
L.H MAIN GEAR
741
R.H MAIN GEAR
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 32-11-11-000-001-A
Removal of the MLG Leg Assembly
TASK 32-11-11-400-001-A
Installation of the MLG Leg Assembly
3. Job Set-up
Subtask 32-11-00-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Equipment
   (1) Remove the applicable MLG (Ref. AMM TASK 32-11-11-000-001).
4. Procedure
Subtask 32-11-00-220-071-A ** ON A/C NOT FOR ALL
A. Special Detailed Inspection of Main Landing Gear, Main Fitting Comprising:
  • Main Fitting
  • Upper Diaphragm Tube
  • Sliding Tube
  • Lower Bearing Housing (Twin Wheel)
   (1) Send the equipment to the workshop and refer to MPD Appendix 7.
5. Close-up
Subtask 32-11-00-420-051-A ** ON A/C NOT FOR ALL
A. Install the Equipment
   (1) Install the applicable MLG (Ref. AMM TASK 32-11-11-400-001).
[Rev.10 from 2021] 2026.04.01 00:39:46 UTC