W DOC AIRBUS | AMM A320F

Installation of the Check Valve and of the Rain Repellent Blowout Reservoir


TASK 30-45-45-400-001-A
Installation of the Check Valve and of the Rain Repellent Blowout Reservoir


WARNING: DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
  • FLUSH IT AWAY WITH CLEAN WATER
  • GET MEDICAL AID.
CAUTION: MAKE SURE THAT THE FLUID DOES NOT STAY ON THE AIRCRAFT STRUCTURE. IF THE FLUID GETS ON THE AIRCRAFT STRUCTURE, WASH IT OFF IMMEDIATELY WITH SOAP AND WATER.
ZONE: 120
FIN: 5DM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
811
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
11
O-RING
AIPC 30-45-01-04-040
3
O-RING
AIPC 30-45-01-04-040
13
O-RING
AIPC 30-45-01-04-080
16
O-RING
AIPC 30-45-01-04-080
5
O-RING
AIPC 30-45-01-04-080
7
O-RING
AIPC 30-45-01-04-080
11
O-RING
AIPC 30-45-81-04-030
3
O-RING
AIPC 30-45-81-04-030
13
O-RING
AIPC 30-45-81-04-060
16
O-RING
AIPC 30-45-81-04-060
5
O-RING
AIPC 30-45-81-04-060
7
O-RING
AIPC 30-45-81-04-060
 D. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 30-45-45-865-055-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUANTI ICE/RAIN/RPLNT/CAPT1DB1D01
122VUANTI ICE/RAIN/RPLNT/F/O1DB2W11
Subtask 30-45-45-860-050-A
B. Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
Subtask 30-45-45-010-051-A
C. Make sure that the access door 811 is open.
4. Procedure
Subtask 30-45-45-420-051-A
A. Installation of the Check Valve and the Reservoir
   (1) Install a new AIPC 30-45-01-04-080 O-RING (13) or AIPC 30-45-81-04-060 O-RING (13) on the union (14).
   (2) Install the union (14) on the reservoir (9) and tighten the union.
   (3) Install a new
AIPC 30-45-01-04-080 O-RING (16) or AIPC 30-45-81-04-060 O-RING (16) on the plug (17).
   (4) Install the plug (17) on the reservoir (9) and tighten the plug.
   (5) Install a new
AIPC 30-45-01-04-040 O-RING (11) or AIPC 30-45-81-04-030 O-RING (11) on the plug (12).
   (6) Install the plug (12) on the reservoir (9) and tighten the plug.
   (7) Install a new
AIPC 30-45-01-04-080 O-RING (7) or AIPC 30-45-81-04-060 O-RING (7) with the union (6).
   (8) Install the union (6) with its O-ring on the reservoir (9) and tighten.
   (9) Install a new
AIPC 30-45-01-04-080 O-RING (5) or AIPC 30-45-81-04-060 O-RING (5) on the check valve (4).
   (10) Install the check valve (4) on the union (6) and tighten the check valve.
   (11) Install a new
AIPC 30-45-01-04-040 O-RING (3) or AIPC 30-45-81-04-030 O-RING (3) on the union (2).
   (12) Install the union (2) with its O-ring on the check valve (4) and tighten the union.
   (13) Remove the blanking plugs from the disconnected line ends.
   (14) Install the reservoir (9) and the clamps (8) and (10).Do not fully tighten the clamps at this time.
   (15) Connect and tighten the line (15) on the union (14).
   (16) Connect the elbow (1) to the union (2) and tighten the elbow.
Subtask 30-45-45-210-050-A
B. Visual Inspection
   (1) Make sure that the reservoir (9) is correctly installed.
   (2) Make sure that there are no leaks.
Subtask 30-45-45-420-052-A
C. Tighten the clamps (8) and (10).
5. Close-up
Subtask 30-45-45-865-056-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUANTI ICE/RAIN/RPLNT/CAPT1DB1D01
122VUANTI ICE/RAIN/RPLNT/F/O1DB2W11
Subtask 30-45-45-410-050-A
[Rev.10 from 2021] 2026.04.01 00:31:26 UTC