Installation of the Check Valve and of the Rain Repellent Blowout Reservoir
TASK 30-45-45-400-001-A
Installation of the Check Valve and of the Rain Repellent Blowout Reservoir
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 30-45-45-865-055-A
Subtask 30-45-45-420-051-A
Subtask 30-45-45-865-056-A
[Rev.10 from 2021]
2026.04.01 00:31:26 UTC
Installation of the Check Valve and of the Rain Repellent Blowout Reservoir
WARNING:
DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
- FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
CAUTION:
MAKE SURE THAT THE FLUID DOES NOT STAY ON THE AIRCRAFT STRUCTURE. IF THE FLUID GETS ON THE AIRCRAFT STRUCTURE, WASH IT OFF IMMEDIATELY WITH SOAP AND WATER.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 811 |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 11 | O-RING | AIPC 30-45-01-04-040 |
| 3 | O-RING | AIPC 30-45-01-04-040 |
| 13 | O-RING | AIPC 30-45-01-04-080 |
| 16 | O-RING | AIPC 30-45-01-04-080 |
| 5 | O-RING | AIPC 30-45-01-04-080 |
| 7 | O-RING | AIPC 30-45-01-04-080 |
| 11 | O-RING | AIPC 30-45-81-04-030 |
| 3 | O-RING | AIPC 30-45-81-04-030 |
| 13 | O-RING | AIPC 30-45-81-04-060 |
| 16 | O-RING | AIPC 30-45-81-04-060 |
| 5 | O-RING | AIPC 30-45-81-04-060 |
| 7 | O-RING | AIPC 30-45-81-04-060 |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 30-45-45-865-055-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 30-45-45-860-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | ANTI ICE/RAIN/RPLNT/CAPT | 1DB1 | D01 |
| 122VU | ANTI ICE/RAIN/RPLNT/F/O | 1DB2 | W11 |
B. Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
Subtask 30-45-45-010-051-A 4. ProcedureSubtask 30-45-45-420-051-A
A. Installation of the Check Valve and the Reservoir
(1) Install a new AIPC 30-45-01-04-080 O-RING (13) or AIPC 30-45-81-04-060 O-RING (13) on the union (14).
(2) Install the union (14) on the reservoir (9) and tighten the union.
(3) Install a new AIPC 30-45-01-04-080 O-RING (16) or AIPC 30-45-81-04-060 O-RING (16) on the plug (17).
(4) Install the plug (17) on the reservoir (9) and tighten the plug.
(5) Install a new AIPC 30-45-01-04-040 O-RING (11) or AIPC 30-45-81-04-030 O-RING (11) on the plug (12).
(6) Install the plug (12) on the reservoir (9) and tighten the plug.
(7) Install a new AIPC 30-45-01-04-080 O-RING (7) or AIPC 30-45-81-04-060 O-RING (7) with the union (6).
(8) Install the union (6) with its O-ring on the reservoir (9) and tighten.
(9) Install a new AIPC 30-45-01-04-080 O-RING (5) or AIPC 30-45-81-04-060 O-RING (5) on the check valve (4).
(10) Install the check valve (4) on the union (6) and tighten the check valve.
(11) Install a new AIPC 30-45-01-04-040 O-RING (3) or AIPC 30-45-81-04-030 O-RING (3) on the union (2).
(12) Install the union (2) with its O-ring on the check valve (4) and tighten the union.
(13) Remove the blanking plugs from the disconnected line ends.
(14) Install the reservoir (9) and the clamps (8) and (10).Do not fully tighten the clamps at this time.
(15) Connect and tighten the line (15) on the union (14).
(16) Connect the elbow (1) to the union (2) and tighten the elbow.
Subtask 30-45-45-210-050-A (1) Install a new AIPC 30-45-01-04-080 O-RING (13) or AIPC 30-45-81-04-060 O-RING (13) on the union (14).
(2) Install the union (14) on the reservoir (9) and tighten the union.
(3) Install a new AIPC 30-45-01-04-080 O-RING (16) or AIPC 30-45-81-04-060 O-RING (16) on the plug (17).
(4) Install the plug (17) on the reservoir (9) and tighten the plug.
(5) Install a new AIPC 30-45-01-04-040 O-RING (11) or AIPC 30-45-81-04-030 O-RING (11) on the plug (12).
(6) Install the plug (12) on the reservoir (9) and tighten the plug.
(7) Install a new AIPC 30-45-01-04-080 O-RING (7) or AIPC 30-45-81-04-060 O-RING (7) with the union (6).
(8) Install the union (6) with its O-ring on the reservoir (9) and tighten.
(9) Install a new AIPC 30-45-01-04-080 O-RING (5) or AIPC 30-45-81-04-060 O-RING (5) on the check valve (4).
(10) Install the check valve (4) on the union (6) and tighten the check valve.
(11) Install a new AIPC 30-45-01-04-040 O-RING (3) or AIPC 30-45-81-04-030 O-RING (3) on the union (2).
(12) Install the union (2) with its O-ring on the check valve (4) and tighten the union.
(13) Remove the blanking plugs from the disconnected line ends.
(14) Install the reservoir (9) and the clamps (8) and (10).Do not fully tighten the clamps at this time.
(15) Connect and tighten the line (15) on the union (14).
(16) Connect the elbow (1) to the union (2) and tighten the elbow.
B. Visual Inspection
(1) Make sure that the reservoir (9) is correctly installed.
(2) Make sure that there are no leaks.
Subtask 30-45-45-420-052-A (1) Make sure that the reservoir (9) is correctly installed.
(2) Make sure that there are no leaks.
C. Tighten the clamps (8) and (10).
5. Close-upSubtask 30-45-45-865-056-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 30-45-45-410-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | ANTI ICE/RAIN/RPLNT/CAPT | 1DB1 | D01 |
| 122VU | ANTI ICE/RAIN/RPLNT/F/O | 1DB2 | W11 |
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 811.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 811.
(3) Remove the access platform(s).
Rain Repellent Blowout Reservoir