Removal of the Ground Leakage-Measurement Manifold of the Green Hydraulic System
TASK 29-19-41-000-001-A
Removal of the Ground Leakage-Measurement Manifold of the Green Hydraulic System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-19-41-865-050-A ** ON A/C NOT FOR ALL
Subtask 29-19-41-020-050-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:25:31 UTC
Removal of the Ground Leakage-Measurement Manifold of the Green Hydraulic System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 1 | CONTAINER 2 L (0.53 USGAL) |
| No specific | 1 | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
Subtask 29-19-41-865-050-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-19-41-941-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
B. Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
Subtask 29-19-41-860-052-A ** ON A/C NOT FOR ALL - In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Green hydraulic system.
C. Aircraft Maintenance Configuration
(2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
(4) Open the Right Hand (RH) main-door of the Main-Landing-Gear (Ref. AMM TASK 32-12-00-010-001).
(5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the RH main door of the main gear.
(6) Put a CONTAINER 2 L (0.53 USGAL) below the manifold 1146GM to collect unwanted fluid.
(7) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
(4) Open the Right Hand (RH) main-door of the Main-Landing-Gear (Ref. AMM TASK 32-12-00-010-001).
(5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the RH main door of the main gear.
(6) Put a CONTAINER 2 L (0.53 USGAL) below the manifold 1146GM to collect unwanted fluid.
(7) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-19-41-020-050-B ** ON A/C NOT FOR ALL
A. Removal of the Ground Leakage-Measurement Manifold 1146GM
(2) Loosen the pipe end-fitting (8) and disconnect the pipe (7) from the union (9).
(3) Loosen the pipe end-fitting (5) and disconnect the pipe (6) from the union (4).
(4) Loosen the pipe end-fitting (14) and disconnect the pipe (15) from the union (13).
(5) Loosen the pipe end-fitting (17) and disconnect the pipe (16) from the union (18).
(6) Hold the manifold (1) and remove the bolts (2), the washers (3) and the manifold (1).
(7) Install PLUG - BLANKING in all pipe connections and on the unions.
CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
(1) Loosen the pipe end-fitting (11) and disconnect the pipe (10) from the union (12). (2) Loosen the pipe end-fitting (8) and disconnect the pipe (7) from the union (9).
(3) Loosen the pipe end-fitting (5) and disconnect the pipe (6) from the union (4).
(4) Loosen the pipe end-fitting (14) and disconnect the pipe (15) from the union (13).
(5) Loosen the pipe end-fitting (17) and disconnect the pipe (16) from the union (18).
(6) Hold the manifold (1) and remove the bolts (2), the washers (3) and the manifold (1).
(7) Install PLUG - BLANKING in all pipe connections and on the unions.
Ground Leakage-Measurement Manifold - Green Hydraulic System (1146GM)