W DOC AIRBUS | AMM A320F

Removal of the Ground Leakage-Measurement Manifold of the Green Hydraulic System


TASK 29-19-41-000-001-A
Removal of the Ground Leakage-Measurement Manifold of the Green Hydraulic System


ZONE: 147
FIN: 1146GM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
1
CONTAINER 2 L (0.53 USGAL)
No specific
1
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
147
MAIN GEAR WELL AND HYDRAULIC COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
3. Job Set-up
Subtask 29-19-41-865-050-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST1881GPN35
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
Subtask 29-19-41-941-050-A ** ON A/C NOT FOR ALL
B. Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
  • In the cockpit on the hydraulic section 40VU of the overhead panel
  • On the ground service panel of the Green hydraulic system.
Subtask 29-19-41-860-052-A ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (3) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
   (4) Open the Right Hand (RH) main-door of the Main-Landing-Gear (Ref. AMM TASK 32-12-00-010-001).
   (5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the RH main door of the main gear.
   (6) Put a CONTAINER 2 L (0.53 USGAL) below the manifold 1146GM to collect unwanted fluid.
   (7) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
4. Procedure
Subtask 29-19-41-020-050-B ** ON A/C NOT FOR ALL
A. Removal of the Ground Leakage-Measurement Manifold 1146GM
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
   (1) Loosen the pipe end-fitting (11) and disconnect the pipe (10) from the union (12).
   (2) Loosen the pipe end-fitting (8) and disconnect the pipe (7) from the union (9).
   (3) Loosen the pipe end-fitting (5) and disconnect the pipe (6) from the union (4).
   (4) Loosen the pipe end-fitting (14) and disconnect the pipe (15) from the union (13).
   (5) Loosen the pipe end-fitting (17) and disconnect the pipe (16) from the union (18).
   (6) Hold the manifold (1) and remove the bolts (2), the washers (3) and the manifold (1).
   (7) Install PLUG - BLANKING in all pipe connections and on the unions.
[Rev.10 from 2021] 2026.04.01 00:25:31 UTC