W DOC AIRBUS | AMM A320F

Installation of the ACT Vent-Valve Actuator


TASK 28-28-72-400-001-A
Installation of the ACT Vent-Valve Actuator


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: OBEY THE FUEL SAFETY PROCEDURES.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 140
FIN: 91QH ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.11 and 0.10 m.daN (9.73 and 8.85 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.01ABA1)
Turbine Fuel-- Kerosene -
(Material No.03FAB1)
Mineral Oil base Grease-- Vaseline or Petrolatum -
(Material No.14QFC1)
Wire-Locking Dia: 0.8 mm CRES -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
140
CENTER WING
195BB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
4
O-RING
AIPC 28-28-83-07-090
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-11-28-650-003-A
Pressure Refuel with Automatic Control
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 28-25-00-869-001-A
Fuel Transfer
TASK 28-28-00-710-006-A
Operational Test of the ACT Vent Valve Actuator
3. Job Set-up
Subtask 28-28-72-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized.
(Ref. AMM TASK 24-41-00-861-002).
   (2) When you do maintenance work on the fuel system you must obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
   (3) On the APU section of overhead panel 25VU, make sure that the APU/MASTER SW pushbutton switch is released (the ON legend is off).
   (4) On the FUEL section of panel 40VU, make sure that all the L TK PUMPS and R TK PUMPS pushbutton switches are released (the OFF legends are on).
   (5) Make sure that the WARNING NOTICE(S) is (are) in position:
  • On the APU section of overhead panel 25VU to tell persons not to operate the APU/MASTER SW pushbutton switch
  • On the FUEL section of panel 40VU to tell persons not to operate the fuel system
  • On the ENG/APU FIRE panel on overhead panel 20VU to tell persons not to operate the fire extinguishing system.
  • On the Additional Center Tank (ACT) section of control panel 28VU to tell persons not to operate the fuel system.
   (6) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the main gear doors.
   (7) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at zone 195.
   (8) Make sure that access panel 195BB is open.
4. Procedure
Subtask 28-28-72-420-050-B ** ON A/C NOT FOR ALL
A. Installation of the Actuator
F ACT Vent-Valve Actuator ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the PLUG-BLANKING from each disconnected line end.
NOTE: A locating pin is installed on the mounting flange (1) for the correct installation of the actuator (5).
   (4) Installation of the new AIPC 28-28-83-07-090 O-RING (4):
     (a) Apply Turbine Fuel-- Kerosene - (Material No.
01ABA1) or Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) to the new AIPC 28-28-83-07-090 O-RING (4).
     (b) Install the new O-ring (4) on the mounting flange (1).
   (5) Install the mounting flange (1) on the actuator (5) as follows:
     (a) Install the V-clamp (3) on the mounting flange (1).
     (b) Close the V-clamp (3) and tighten the screw (7).
CAUTION: DO NOT TORQUE THE V-CLAMP(S) TO MORE THAN THE SPECIFIED VALUE. THIS CAN CAUSE DAMAGE TO THE FLANGE SURFACES.
     (c) TORQUE the screw (7) to between 0.11 and 0.10 m.daN (9.73 and 8.85 lbf.in )
T.
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
     (d) Safety the screw (7) with 14QFC1Wire-Locking Dia: 0.8 mm CRES -.
   (6) Put the actuator (5) in position. Make sure that the splines of the splined shaft are aligned with their grooves.
   (7) Install the four nuts (2) and tighten them.
   (8) Do a check of the electrical bonding (
Ref. AMM TASK 20-28-00-912-802).
   (9) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (10) Make sure that all the electrical connections are clean and in the correct condition.
   (11) Connect the electrical connectors (6) to the actuator (5).
Subtask 28-28-72-650-050-A ** ON A/C NOT FOR ALL
B. Fuel Configuration
   (1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-28-72-710-050-A ** ON A/C NOT FOR ALL
C. Do an operational test of the ACT vent-valve actuator (Ref. AMM TASK 28-28-00-710-006).
5. Close-up
Subtask 28-28-72-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close access panel 195BB.
   (3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 28-28-72-942-050-A ** ON A/C NOT FOR ALL
B. Removal of Equipment
   (1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.02 06:18:02 UTC