Replacement of the Relay 98QH
TASK 28-28-00-920-002-A
Replacement of the Relay 98QH
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 28-28-00-860-183-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-020-054-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-410-074-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:17:47 UTC
Replacement of the Relay 98QH
ZONE: 120
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 822 |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | RELAY | AIPC 28-28-08-01-040 |
| 2 | RELAY | AIPC 28-28-88-01-030 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 28-28-00-710-006-A | Operational Test of the ACT Vent Valve Actuator |
Subtask 28-28-00-860-183-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the ground service network (Ref. AMM TASK 24-42-00-861-001).
(2) Put the WARNING NOTICE(S) on the panels that follow, to tell persons not to operate refuel/defuel system:
Subtask 28-28-00-865-120-A ** ON A/C NOT FOR ALL (1) Energize the ground service network (Ref. AMM TASK 24-42-00-861-001).
(2) Put the WARNING NOTICE(S) on the panels that follow, to tell persons not to operate refuel/defuel system:
- Refuel/defuel panels 800VU and 801VU
- Fuel panel 40VU
- Additional Center Tank (ACT) fuel control panel 28VU.
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 28-28-00-010-094-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/ACT AIR SOV/MAN/SPLY | 64QH | J20 |
| 121VU | FUEL/ACT AIR SOV/AUTO/SPLY | 63QH | J19 |
| 121VU | FUEL/ACT VENT VLV/MAN/SPLY | 62QH | L21 |
| 121VU | FUEL/ACT VENT VLV/AUTO/SPLY | 61QH | L20 |
C. Get access to the avionics compartment.
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at avionics compartment door 822.
(2) Open access door 822 of the avionics compartment.
(3) Open the access panel of electronic rack 103VU.
4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at avionics compartment door 822.
(2) Open access door 822 of the avionics compartment.
(3) Open the access panel of electronic rack 103VU.
Subtask 28-28-00-020-054-A ** ON A/C NOT FOR ALL
A. Removal of Relay 98QH
(1) Loosen the screws (1) and remove the relay (2) from the base (3).
Subtask 28-28-00-420-054-A ** ON A/C NOT FOR ALL (1) Loosen the screws (1) and remove the relay (2) from the base (3).
B. Installation of the Relay 98QH
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install a new AIPC 28-28-08-01-040 RELAY (2)AIPC 28-28-88-01-030 RELAY (2) on the base (3).
Subtask 28-28-00-865-121-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install a new AIPC 28-28-08-01-040 RELAY (2)AIPC 28-28-88-01-030 RELAY (2) on the base (3).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-28-00-710-074-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FUEL/ACT AIR SOV/MAN/SPLY | 64QH | J20 |
| 121VU | FUEL/ACT AIR SOV/AUTO/SPLY | 63QH | J19 |
| 121VU | FUEL/ACT VENT VLV/MAN/SPLY | 62QH | L21 |
| 121VU | FUEL/ACT VENT VLV/AUTO/SPLY | 61QH | L20 |
D. Operational Test
(1) Do the operational test of ACT vent-valve actuator 91QH (Ref. AMM TASK 28-28-00-710-006).
5. Close-up(1) Do the operational test of ACT vent-valve actuator 91QH (Ref. AMM TASK 28-28-00-710-006).
Subtask 28-28-00-410-074-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Close the access panel of electronic rack 103VU.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the access door 822 of the battery compartment.
Subtask 28-28-00-860-184-A ** ON A/C NOT FOR ALL (1) Close the access panel of electronic rack 103VU.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the access door 822 of the battery compartment.
B. Put the aircraft back to the serviceable condition.
(1) Remove the warning notices from:
(3) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) Remove the warning notices from:
- Refuel/defuel panels 800VU and 801VU
- Fuel control panel 40VU
- Additional Center Tank (ACT) fuel control panel 28VU.
(3) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Relay 98QH