Removal of the SEC
TASK 27-94-34-000-001-A
Removal of the SEC
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 27-94-34-810-050-A
Subtask 27-94-34-020-050-A
[Rev.10 from 2021]
2026.04.01 04:36:59 UTC
Removal of the SEC
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 121 | AVIONICS COMPARTMENT |
| 127 | REAR AVIONIC COMPARTMENT |
| 128 | REAR AVIONIC COMPARTMENT |
| 822 | |
| FOR [1CE1] (SEC-1) | |
| FOR [1CE2] (SEC-2) | |
| 824 | |
| FOR [1CE3] (SEC-3) | |
| 811 | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 31-32-00-860-006-A | Procedure to Get Access to the SYSTEM REPORT/TEST F/CTL Page |
Subtask 27-94-34-810-050-A
A. Trouble Shooting Data
(1) You can print the Trouble Shooting Data (TSD) as follows:
Subtask 27-94-34-010-050-A (1) You can print the Trouble Shooting Data (TSD) as follows:
- get access to the SYSTEM/REPORT/TEST (Ref. AMM TASK 31-32-00-860-006).
- on this page, push the line key adjacent to the EFCS1 and/or EFCS2 indication.
- on this page, push the line key adjacent to the LAST LEG REPORT indication.
- on this page, push the line key adjacent to the failure(s) to get the TROUBLE SHOOTING DATA page.
- print the TROUBLE SHOOTING DATA page.
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824, 811 and 822.
(2) Open the access door:
(a) FOR [1CE1] (SEC-1), [1CE2] (SEC-2)
824
(b) FOR [1CE3] (SEC-3)
811
(c) For battery power center 105VU 822.
(3) On the battery power center 105VU:
Subtask 27-94-34-865-050-A (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824, 811 and 822.
(2) Open the access door:
(a) FOR [1CE1] (SEC-1), [1CE2] (SEC-2)
824
(b) FOR [1CE3] (SEC-3)
811
(c) For battery power center 105VU 822.
(3) On the battery power center 105VU:
- Loosen the two screws and remove the protective cover
C. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1CE1 (SEC1) | |||
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| FOR FIN: 1CE2 (SEC2) | |||
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| FOR FIN: 1CE3 (SEC3) | |||
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
Subtask 27-94-34-020-050-A
A. Removal of the SEC
(1) Loosen the knurled nuts (4).
(2) Lower the nuts (4).
(3) Pull the SEC (1) on its rack (3) to disconnect the electrical connectors (2).
(4) Remove the SEC (1).
(5) Put CAP - BLANKING on the disconnected electrical connectors (2).
(1) Loosen the knurled nuts (4).
(2) Lower the nuts (4).
(3) Pull the SEC (1) on its rack (3) to disconnect the electrical connectors (2).
(4) Remove the SEC (1).
(5) Put CAP - BLANKING on the disconnected electrical connectors (2).
Spoiler Elevator Computer (SEC)