Removal of the Reinforced End Stops for the ACT
TASK 25-52-53-000-002-A
Removal of the Reinforced End Stops for the ACT
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-52-53-010-054-B ** ON A/C NOT FOR ALL
Subtask 25-52-53-020-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 06:23:21 UTC
Removal of the Reinforced End Stops for the ACT
ZONE: 150
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 25-52-53-010-054-B ** ON A/C NOT FOR ALL
A. Get Access
(1) Open the forward or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the forward or aft cargo-compartment door.
4. Procedure(1) Open the forward or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the forward or aft cargo-compartment door.
Subtask 25-52-53-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Reinforced End Stops
(1) Remove and discard the cotter pins (4).
(2) Remove the nuts (5), the washers (6), the bolts (7) and the rollers (2) and remove the reinforced end stops (1) from the roller track (3).
Subtask 25-52-53-020-051-C ** ON A/C NOT FOR ALL (1) Remove and discard the cotter pins (4).
(2) Remove the nuts (5), the washers (6), the bolts (7) and the rollers (2) and remove the reinforced end stops (1) from the roller track (3).
A. Removal of the Reinforced End Stops
(1) Remove and discard the cotter pins (4).
(2) Remove the nuts (5), the washers (6) and the bolts (7) from the reinforced end stop (1).
(3) Remove the reinforced end stop (1) and the roller (2) from the roller track (3).
(4) Remove the plates (8).
(1) Remove and discard the cotter pins (4).
(2) Remove the nuts (5), the washers (6) and the bolts (7) from the reinforced end stop (1).
(3) Remove the reinforced end stop (1) and the roller (2) from the roller track (3).
(4) Remove the plates (8).
Reinforced End Stop for 2 ACT