W DOC AIRBUS | AMM A320F

Removal of the Reinforced End Stops for the ACT


TASK 25-52-53-000-002-A
Removal of the Reinforced End Stops for the ACT


ZONE: 150
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
F Reinforced End Stop for 2 ACT ** ON A/C NOT FOR ALL
F Reinforced End Stops for the ACT ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-52-53-010-054-B ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the forward or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
   (2) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the forward or aft cargo-compartment door.
4. Procedure
Subtask 25-52-53-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Reinforced End Stops
   (1) Remove and discard the cotter pins (4).
   (2) Remove the nuts (5), the washers (6), the bolts (7) and the rollers (2) and remove the reinforced end stops (1) from the roller track (3).
Subtask 25-52-53-020-051-C ** ON A/C NOT FOR ALL
A. Removal of the Reinforced End Stops
   (1) Remove and discard the cotter pins (4).
   (2) Remove the nuts (5), the washers (6) and the bolts (7) from the reinforced end stop (1).
   (3) Remove the reinforced end stop (1) and the roller (2) from the roller track (3).
   (4) Remove the plates (8).
[Rev.10 from 2021] 2026.04.01 06:23:21 UTC