W DOC AIRBUS | AMM A320F

Removal of the Fixed XZ-Latch for ACT


TASK 25-52-34-000-004-A
Removal of the Fixed XZ-Latch for ACT


ZONE: 150
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 28-11-27-000-001-A
Removal of the Additional Center Tank (ACT)
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 53-42-14-000-001-A
Removal of the Aft Cargo-Compartment Floor-Panels Zone 150
F Fixed XZ-Latch for ACT ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-52-34-010-056-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
   (2) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo-compartment door.
Subtask 25-52-34-010-056-C ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the forward or aft cargo compartment door (Ref. AMM TASK 52-30-00-860-001).
   (2) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the forward or aft cargo compartment door.
Subtask 25-52-34-860-059-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Remove the applicable ACT (Ref. AMM TASK 28-11-27-000-001).
   (2) Remove the floor panels (Ref. AMM TASK 53-42-14-000-001) to get access to the fixed XZ-latches.
Subtask 25-52-34-860-059-B ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Remove the applicable Additional Center Tank (ACT) (Ref. AMM D/O 28-11-27-00).
4. Procedure
Subtask 25-52-34-020-057-A ** ON A/C NOT FOR ALL
A. Removal of the Fixed XZ-Latch
   (1) Remove and discard the cotter pins (1) from the spindles (4).
   (2) Remove the spindles (4) from the fixed XZ-latch (2) and the roller track (3).
   (3) Lift and remove the fixed XZ-latch (2) from the roller track (3).
[Rev.10 from 2021] 2026.03.31 23:38:10 UTC