W DOC AIRBUS | AMM A320F

Installation of the Ball Unit


TASK 25-52-23-400-001-A
Installation of the Ball Unit


ZONE: 130
ZONE: 150
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
130
FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 25-52-23-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the forward and/or aft cargo-compartment door is opened (Ref. AMM TASK 52-30-00-860-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the applicable cargo-compartment door.
   (3) Make sure that the WARNING NOTICE(S) is in position at the applicable control panel of the cargo loading system.
Subtask 25-52-23-865-063-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUSEMI AUTO CLS-FWD3MYE08
2000VUSEMI AUTO CLS-FWD2MYE06
2001VUSEMI AUTO CLS-AFT103MYD08
2001VUSEMI AUTO CLS-AFT102MYD06
4. Procedure
Subtask 25-52-23-210-050-B ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the bore for the ball unit (3) is clean.
Subtask 25-52-23-420-050-B ** ON A/C NOT FOR ALL
B. Installation of the Ball Unit
NOTE: The installation of the ball unit to the ball mats and the ball strips is the same.
   (1) Put the ball unit (3) in position in the bore.
   (2) Push the ball unit (3) down into the bore.
   (3) Make sure that the attachment pins (1) are correctly engaged.
5. Close-up
Subtask 25-52-23-210-051-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
Subtask 25-52-23-865-064-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUSEMI AUTO CLS-FWD3MYE08
2000VUSEMI AUTO CLS-FWD2MYE06
2001VUSEMI AUTO CLS-AFT103MYD08
2001VUSEMI AUTO CLS-AFT102MYD06
Subtask 25-52-23-410-050-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Remove the WARNING NOTICE(S).
   (2) Remove the access platform(s).
   (3) Close the forward and/or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).