Deactivation of the Toilet Waste-Compartment Flapper-Door
TASK 25-40-00-040-001-A
Deactivation of the Toilet Waste-Compartment Flapper-Door
1. Reason for the Job
MMEL 25-40-01A
TOILET WASTE COMPARTMENT FLAPPER DOOR
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 25-40-00-861-056-A
Subtask 25-40-00-040-050-A
Subtask 25-40-00-410-062-A
[Rev.10 from 2021]
2026.03.31 23:34:47 UTC
Deactivation of the Toilet Waste-Compartment Flapper-Door
1. Reason for the Job
MMEL 25-40-01A
TOILET WASTE COMPARTMENT FLAPPER DOOR
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RAB9) | Adhesive Film Tape-- Aluminium Foil - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 25-40-00-861-056-A
A. There is no special job set-up for this task.
4. ProcedureSubtask 25-40-00-040-050-A
A. Deactivation of the Defective or Missing Waste-Compartment Flapper-Door
(1) Seal the opening of the waste chute with self adhesive tape Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) .
(2) Put a WARNING NOTICE(S) in position to tell persons not to use the waste compartment.
(3) Open the access door of the waste compartment:
(a) Make sure that the waste container is empty.
5. Close-up(1) Seal the opening of the waste chute with self adhesive tape Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) .
(2) Put a WARNING NOTICE(S) in position to tell persons not to use the waste compartment.
(3) Open the access door of the waste compartment:
(a) Make sure that the waste container is empty.
Subtask 25-40-00-410-062-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door of the waste compartment.
(3) Make an entry in the logbook.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door of the waste compartment.
(3) Make an entry in the logbook.
Flapper Door