Installation of the Captain/First Officer Foot Warmer
TASK 25-15-51-400-001-A
Installation of the Captain/First Officer Foot Warmer
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
3. Job Set-up
Subtask 25-15-51-865-051-A ** ON A/C NOT FOR ALL
Subtask 25-15-51-420-050-A ** ON A/C NOT FOR ALL
Subtask 25-15-51-942-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:29:30 UTC
Installation of the Captain/First Officer Foot Warmer
ZONE: 211
ZONE: 212
FIN: 2DR1 ** ON A/C NOT FOR ALL
FIN: 2DR2 ** ON A/C NOT FOR ALL
FIN: 2DR3 ** ON A/C NOT FOR ALL
FIN: 2DR4 ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 212
FIN: 2DR1 ** ON A/C NOT FOR ALL
FIN: 2DR2 ** ON A/C NOT FOR ALL
FIN: 2DR3 ** ON A/C NOT FOR ALL
FIN: 2DR4 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 211 | COCKPIT |
| 212 | COCKPIT |
Subtask 25-15-51-865-051-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | FOOT WARMER | 1DR | X15 |
Subtask 25-15-51-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Captain/First Officer Foot Warmer
(1) Remove the blanking cap from the electrical connector (2).
(2) Connect the electrical connector (2) to the foot warmer (1).
(3) Install the foot warmer (1), the screws (3) and tighten them.
Subtask 25-15-51-865-052-A ** ON A/C NOT FOR ALL (1) Remove the blanking cap from the electrical connector (2).
(2) Connect the electrical connector (2) to the foot warmer (1).
(3) Install the foot warmer (1), the screws (3) and tighten them.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-15-51-720-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | FOOT WARMER | 1DR | X15 |
C. Do this operational test:
(2) Make sure that the foot warmer operates.
(3) On the F/O lighting/loud speaker control panel 500VU, set the switch 3DR2 to the ON position.
(4) Make sure that the foot warmer operates.
5. Close-upNOTE: Do this step only if a handset is installed.
(1) On the CAPT lighting/loud speaker control panel 301VU, set the switch 3DR1 to the ON position. (2) Make sure that the foot warmer operates.
(3) On the F/O lighting/loud speaker control panel 500VU, set the switch 3DR2 to the ON position.
(4) Make sure that the foot warmer operates.
Subtask 25-15-51-942-050-A ** ON A/C NOT FOR ALL
A. Removal of the Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.