Detailed Inspection of G, E and P Routes Installed in the Stair Bay (EWIS)
TASK 24-92-00-220-010-A
Detailed Inspection of G, E and P Routes Installed in the Stair Bay (EWIS)
Refer to the MPD TASK: 200129-03
DETAILED INSPECTION OF G, E AND P ROUTES INSTALLED IN THE STAIR BAY (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Procedure
Subtask 24-92-00-220-060-A ** ON A/C NOT FOR ALL
[Rev.8 from Aug 2017]
2026.03.31 23:26:58 UTC
Detailed Inspection of G, E and P Routes Installed in the Stair Bay (EWIS)
ZONE: 129
1. Reason for the JobRefer to the MPD TASK: 200129-03
DETAILED INSPECTION OF G, E AND P ROUTES INSTALLED IN THE STAIR BAY (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | FLASHLIGHT |
| No specific | AR | MIRROR - INSPECTION, FLEXIBLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 129 | STAIR BAY |
| REFERENCE | DESIGNATION |
|---|---|
| ESPM 2052120 |
Subtask 24-92-00-220-060-A ** ON A/C NOT FOR ALL
A. Detailed Inspection of G, E and P Route Wiring Installed in the Stair Bay
(1) Do a detailed inspection of the wiring to make sure that there is no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052120:
(a) On the AC/DC feeder routes: 1G and 2G.
(b) On the AC/DC power-distribution routes: 1P and 2P.
(c) On the generator excitation routes: 1E and 2E.
(1) Do a detailed inspection of the wiring to make sure that there is no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052120:
(a) On the AC/DC feeder routes: 1G and 2G.
(b) On the AC/DC power-distribution routes: 1P and 2P.
(c) On the generator excitation routes: 1E and 2E.
NOTE: Use a FLASHLIGHT or a MIRROR - INSPECTION, FLEXIBLE if necessary.
(2) Make sure that there is no dust, lint or hydraulic contamination.