W DOC AIRBUS | AMM A320F

Installation of the Mixer Flap Actuator


TASK 21-51-52-400-001-A
Installation of the Mixer Flap Actuator


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 20HB
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
WARNING NOTICE(S)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03GBB1)
Synthetic Oil base Grease-General Purpose Clay Thickened -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
131NW, 131PW, 825
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
11
SEAL
AIPC 21-21-02-43-055
11
SEAL
AIPC 21-21-82-40-240
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 21-51-00-710-002-A
Operational Test of the Flow Control and Indicating System
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-54-12-000-001-A
Removal of the Forward Cargo-Compartment Partition
TASK 25-54-12-400-001-A
Installation of the Forward Cargo-Compartment Partition
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 21-51-52-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that:
     (a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
     (b) On the overhead panel, on AIR COND panel 30VU:
       1 The APU BLEED pushbutton switch is released (the ON legend is off).
       2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
       3 The WARNING NOTICE(S) is in position to tell persons not to operate these pushbutton switches.
     (c) On the HP and the LP ground connectors the WARNING NOTICE(S) is in position to tell persons not to supply the ground air.
     (d) The ACCESS PLATFORM 2M (6 FT) is in position at the FWD cargo compartment door 825.
WARNING: DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS PRESSURIZED. A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED:
  • WILL CAUSE EXPLOSIVE DECOMPRESSION.
  • CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE AIRCRAFT OR EQUIPMENT.
     (e) The FWD cargo compartment door 825 is open (Ref. AMM TASK 52-30-00-860-001).
     (f) Access panels 131PW and 131NW are removed (Ref. AMM TASK 25-54-12-000-001).
Subtask 21-51-52-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/FLOW/MIXER/FLAP3HBV22
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS24HKV20
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS13HKV19
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS22HKV18
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS11HKV17
** ON A/C ALL
122VUAIR COND/RECIRC FAN/R/CTL11HGW20
122VUAIR COND/RECIRC FAN/R/SPLY3HGW18
122VUAIR COND/RECIRC FAN/L/CTL2HGX20
122VUAIR COND/RECIRC FAN/L/SPLY1HGX18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
4. Procedure
Subtask 21-51-52-420-050-B
A. Installation of the Mixer Flap Actuator
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Remove the protective covers from the sleeve (7), the mixer unit (14) and the mixer-flap actuator housing (9).
   (3) Clean the component interfaces and the adjacent area.
   (4) Do a visual inspection of the component interfaces and the adjacent area.
   (5) Make sure that the seal (11) is in good condition.
   (6) If necessary, replace the AIPC 21-21-02-43-055 SEAL (11) or AIPC 21-21-82-40-240 SEAL (11).
   (7) Apply a small quantity of Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.
03GBB1) to the geared part of the shaft (15).
   (8) Make sure that the shutter valve (2) and the actuator manual-operating arm (1) are in the closed position.
   (9) Put the mixer flap actuator (6) in position on the shaft (15).
   (10) Install the washers (5) and the bolts (4).
   (11) Install the seal (11) on the mixer unit (14).
   (12) Put the mixer-flap actuator housing (9) in position on the mixer unit (14).
   (13) Install the bolts (10), the washers (12) and the nuts (13).
NOTE: Do not tighten the nuts (13) and the bolts (10) too much. This can cause damage to the seal (11).
   (14) Put the sleeve (7) in position on the mixer-flap actuator housing (9).
   (15) Install the clamp (8) on the sleeve (7).
   (16) Make sure that the end of the sleeve (7) is between the coloured marking lines on the mixer-flap actuator housing (9).
   (17) Tighten the clamp (8).
   (18) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION: MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
   (19) Make sure that all the electrical connections are clean and in the correct condition.
   (20) Connect the electrical connector (3).
   (21) Make sure that the work area is clean and clear of tools and other items.
Subtask 21-51-52-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/FLOW/MIXER/FLAP3HBV22
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS24HKV20
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS13HKV19
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS22HKV18
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS11HKV17
** ON A/C ALL
122VUAIR COND/RECIRC FAN/R/CTL11HGW20
122VUAIR COND/RECIRC FAN/R/SPLY3HGW18
122VUAIR COND/RECIRC FAN/L/CTL2HGX20
122VUAIR COND/RECIRC FAN/L/SPLY1HGX18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
Subtask 21-51-52-710-050-A
C. Do the operational test of the flow control and indicating system (Ref. AMM TASK 21-51-00-710-002).
5. Close-up
Subtask 21-51-52-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install access panels 131PW and 131NW (Ref. AMM TASK 25-54-12-400-001).
   (3) Close the FWD cargo compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
   (4) Remove the access platform(s).
Subtask 21-51-52-862-050-A
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.05 10:34:31 UTC