Removal of the Differential Pressure Sensor
TASK 21-51-11-000-001-A
Removal of the Differential Pressure Sensor
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-51-11-861-050-A Subtask 21-51-11-865-050-A
Subtask 21-51-11-020-050-C ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.05 10:34:31 UTC
Removal of the Differential Pressure Sensor
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the pressure sensors pack 1 and pack 2.
FIN: 10HB ** ON A/C NOT FOR ALL
FIN: 23HB2 ** ON A/C NOT FOR ALL
FIN: 24HB2 ** ON A/C NOT FOR ALL
FIN: 9HB ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 23HB2 ** ON A/C NOT FOR ALL
FIN: 24HB2 ** ON A/C NOT FOR ALL
FIN: 9HB ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| FOR [10HB] (P1 FLOW SENSOR) | ||
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLUG - BLANKING |
| FOR [9HB] (P2 FLOW SENSOR) | ||
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLUG - BLANKING |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [10HB] (P1 FLOW SENSOR) | |
| 191KB | |
| FOR [23HB2] (SENSOR-DELTA PRESS,PACK 1) | |
| 191KB | |
| FOR [24HB2] (SENSOR-DELTA PRESS,PACK 2) | |
| 192KB | |
| FOR [9HB] (P2 FLOW SENSOR) | |
| 192KB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
Subtask 21-51-11-861-050-A Subtask 21-51-11-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-51-11-010-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HB (P1 FLOW SENSOR) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| FOR FIN: 9HB (P2 FLOW SENSOR) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 23HB2 (SENSORDELTA PRESS,PACK 1) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| FOR FIN: 24HB2 (SENSORDELTA PRESS,PACK 2) | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
C. Get Access
(1) Remove the access panel (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [10HB] (P1 FLOW SENSOR)
191KB,
(b) FOR [9HB] (P2 FLOW SENSOR)
192KB.
Subtask 21-51-11-010-050-B ** ON A/C NOT FOR ALL (1) Remove the access panel (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [10HB] (P1 FLOW SENSOR)
191KB,
(b) FOR [9HB] (P2 FLOW SENSOR)
192KB.
C. Get Access
(1) Remove the access panel (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [23HB2] (SENSOR-DELTA PRESS,PACK 1)
191KB,
(b) FOR [24HB2] (SENSOR-DELTA PRESS,PACK 2)
192KB.
4. Procedure(1) Remove the access panel (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [23HB2] (SENSOR-DELTA PRESS,PACK 1)
191KB,
(b) FOR [24HB2] (SENSOR-DELTA PRESS,PACK 2)
192KB.
Subtask 21-51-11-020-050-C ** ON A/C NOT FOR ALL
A. Removal of the Pressure Sensor
(1) FOR [10HB] (P1 FLOW SENSOR)
(a) Disconnect the electrical connector (7).
(b) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(c) Disconnect the sense line connectors (1) and (5).
(d) Put the PLUG-BLANKING in each disconnected line end.
(e) Remove the nut (11), the washer (10), the screw (8) and disconnect the bonding strap (9).
(f) Remove the screws (4), the washers (3), the pressure sensor (12) and the clamps (2).
(g) Remove the clamps (2) from the pressure sensor (12).
(2) FOR [9HB] (P2 FLOW SENSOR)
(a) Disconnect the electrical connector (24).
(b) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(c) Disconnect the sense line connectors (21) and (32).
(d) Put the PLUG-BLANKING in each disconnected line end.
(e) Remove the nut (28), the washer (27), the screw (25) and disconnect the bonding strap (26).
(f) Remove the screws (31), the washers (30), the pressure sensor (29) and the clamps (22).
(g) Remove the clamps (22) from the pressure sensor (29).
Subtask 21-51-11-020-050-E ** ON A/C NOT FOR ALL (1) FOR [10HB] (P1 FLOW SENSOR)
(a) Disconnect the electrical connector (7).
(b) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(c) Disconnect the sense line connectors (1) and (5).
(d) Put the PLUG-BLANKING in each disconnected line end.
(e) Remove the nut (11), the washer (10), the screw (8) and disconnect the bonding strap (9).
(f) Remove the screws (4), the washers (3), the pressure sensor (12) and the clamps (2).
(g) Remove the clamps (2) from the pressure sensor (12).
(2) FOR [9HB] (P2 FLOW SENSOR)
(a) Disconnect the electrical connector (24).
(b) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(c) Disconnect the sense line connectors (21) and (32).
(d) Put the PLUG-BLANKING in each disconnected line end.
(e) Remove the nut (28), the washer (27), the screw (25) and disconnect the bonding strap (26).
(f) Remove the screws (31), the washers (30), the pressure sensor (29) and the clamps (22).
(g) Remove the clamps (22) from the pressure sensor (29).
A. Removal of the Pressure Sensor
(1) Remove the screws (7), the washers (8) and the clamp (9).
(2) Discard the washers (8).
(3) Loosen and partially remove the screws (1).
(4) Push the screws (1) to disconnect the sensor (5) from the sensor mount (13).
(a) Use a soft-face mallet and apply moderate taps to the screws (1) to help to disconnect the sensor (5).
(7) Remove and discard the O-rings (11) and (12).
(1) Remove the screws (7), the washers (8) and the clamp (9).
(2) Discard the washers (8).
(3) Loosen and partially remove the screws (1).
(4) Push the screws (1) to disconnect the sensor (5) from the sensor mount (13).
(a) Use a soft-face mallet and apply moderate taps to the screws (1) to help to disconnect the sensor (5).
NOTE: Force may be necessary to disconnect the sensor. Do not use a hard metal tool to avoid damage to the sensor. It is recommended to use a tool with a soft grip.
(5) Remove the screws (1) and the washers (2). NOTE: Make sure that the inserts (3) stay in the sensor mount (13).
(6) Disconnect the electrical connector (6) and remove the sensor (5). (7) Remove and discard the O-rings (11) and (12).
Pressure Sensor