W DOC AIRBUS | AMM A320F

Bleeding of the Standby Air Data System


TASK 12-24-34-600-001-A
Bleeding of the Standby Air Data System


ZONE: 120
1. Reason for the Job
Remove water from the Standby Air Data System.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
1
CONTAINER 3 L(3/4 USGAL)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
811
 C. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 12-24-34-860-051-A
A. Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in the zone 120, opposite the access door 811.
Subtask 12-24-34-010-050-A
B. Open the access door 811.
4. Procedure
Subtask 12-24-34-680-050-A
A. Aircraft Maintenance Configuration
   (1) Put the CONTAINER 3 L(3/4 USGAL) in position under the water drain (1).
   (2) Release the protection plug (2) from the water drain (1).
   (3) Turn the protection plug (2) 180 degrees and put it into the drain valve.
   (4) Push the drain valve until the water in the standby static pressure lines is removed.
   (5) Install the protection plug (2) on the water drain (1) and lock it.
5. Close-up
Subtask 12-24-34-860-050-A
A. Put the aircraft back to its initial configuration.
   (1) Remove the container.
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Remove all the grounding connectors, the maintenance equipment, the special tools and the standard tools, the ground power units, the filling equipment and the other items of equipment.
Subtask 12-24-34-410-050-A
B. Close Access
   (1) Close the access door 811.
   (2) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.01 04:08:06 UTC