W DOC AIRBUS | AMM A320F

Installation of the BSB (DUROFIX) Labels (Material No. 05-136) (Marking with Reactivable Transfer Label)


TASK 11-00-00-400-010-A
Installation of the BSB (DUROFIX) Labels (Material No. 05-136) (Marking with Reactivable Transfer Label)


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
This procedure gives the data necessary for the installation of the service and safety labels (BSB) on the external surfaces of the aircraft.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
BRUSH - BRISTLED, SOFT
No specific
AR
CONTAINER 150L (40 USGAL)
No specific
AR
NEEDLE
No specific
AR
ROLLER - RUBBER
No specific
AR
SCRAPER - PLASTIC
No specific
AR
SPONGE
No specific
AR
WATER - LUKEWARM
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.04SBA3)
Varnish Polyurethane-Low VOC - External Structure
(Material No.05LBC1)
Adhesive-Fixative Label Bonding Durofix -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.08BPA1)
Non Aqueous Cleaner-Non structural use - -
(Material No.14SBA1)
Textile-Lint free Cotton -
3. Job Set-up
Subtask 11-00-00-110-058-A
A. Cleaning of the Contact Surfaces
NOTE: You must let the paint cure during 24 hours minimum at ambient temperature before you install the labels.
   (1) Clean the label contact surface with a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) soaked with Non Aqueous Cleaner-General - - (Material No.08BAA9) or Non Aqueous Cleaner-Non structural use - - (Material No.08BPA1) .
Subtask 11-00-00-915-062-A
B. Preparation of the Bonding Material
NOTE: Obey the instructions of the manufacturer and the safety precautions to use the bonding material.
   (1) If the paint is new, do the step that follows:
     (a) In a CONTAINER 150L (40 USGAL), mix one volume of WATER - LUKEWARM at a temperature between 30 deg.C (86.00 deg.F) and 40 deg.C (104.00 deg.F) with one volume of the fixative Adhesive-Fixative Label Bonding Durofix - (Material No.05LBC1) .
   (2) If the paint is not new, do the steps that follow:
     (a) Apply the fixative Adhesive-Fixative Label Bonding Durofix - (Material No.05LBC1) on the applicable painted area.
     (b) In a CONTAINER 150L (40 USGAL), mix two volumes of WATER - LUKEWARM at a temperature between 30 deg.C (86.00 deg.F) and 40 deg.C (104.00 deg.F) with one volume of the fixative Adhesive-Fixative Label Bonding Durofix - (Material No.05LBC1) .
4. Procedure
Subtask 11-00-00-915-059-A
A. Installation of the Label
NOTE: Let the paint dry before you install the label.
NOTE: Do this work at a temperature between 15 deg.C (59.00 deg.F) and 30 deg.C (86.00 deg.F) and a hygrometry between 40 and 75 percent.
   (1) Put the label in the mixture during 15 to 20 seconds.
   (2) Install the label with the markings against the contact surface.
   (3) Apply a pressure on one of the ends of the label against the support and pull the other end up to prevent wrinkles.
   (4) Apply a pressure on the label against the surface with a SCRAPER - PLASTIC.
NOTE: To prevent wrinkles or air pockets, you must start from the center to the edges.
   (5) Apply a strong pressure on all the surface with a ROLLER - RUBBER.
   (6) At the same time, remove the unwanted solution with a moist SPONGE.
   (7) Apply the moist sponge to the backing paper of the label.
   (8) After 2 minutes, remove the backing paper.
   (9) Lightly remove the remaining compound from the label surface and around the label with a sponge soaked with water.
   (10) If applicable, make holes in the air pockets with a NEEDLE, and apply a pressure with the SCRAPER - PLASTIC.
   (11) If the installation is incorrect
     (a) If the label is moist:
  • Remove the label and do the procedure again with a new label.
     (b) If the label is dry:
  • Apply a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) soaked with Non Aqueous Cleaner-General - - (Material No.08BAA9) on the label.
  • Remove the label with a SCRAPER - PLASTIC.
NOTE: The label is bonded after 3 or 4 days. During this time, do not clean the label area.
Subtask 11-00-00-916-051-B
B. Protection of exterior markings
   (1) Apply a cross coat of Varnish Polyurethane-Low VOC - External Structure (Material No.04SBA3) on all external functional and maintenance markings with a BRUSH - BRISTLED, SOFT.
NOTE: This procedure is recommended for better long-time bonding of the labels on the external surfaces.
NOTE: The labels must dry during for 24 hours minimum at room temperature before you apply the varnish.
5. Close-up
Subtask 11-00-00-942-050-A
A. Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.03.31 22:53:45 UTC