Installation of the Labels on Heat Resistant Ducting
TASK 11-00-00-400-004-A
Installation of the Labels on Heat Resistant Ducting
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Consumable Materials
3. Job Set-up
Subtask 11-00-00-110-052-A
Subtask 11-00-00-915-053-A
Subtask 11-00-00-942-053-A
[Rev.10 from 2021]
2026.03.31 22:53:38 UTC
Installation of the Labels on Heat Resistant Ducting
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06CMD9) | Silicone Adhesive Sealant-General Purpose One part legacy |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
Subtask 11-00-00-110-052-A
A. Cleaning
(1) Degrease and clean the surface to which the label is to be affixed using Non Aqueous Cleaner-General - - (Material No.08BAA9) , then thoroughly dry out.
4. Procedure(1) Degrease and clean the surface to which the label is to be affixed using Non Aqueous Cleaner-General - - (Material No.08BAA9) , then thoroughly dry out.
Subtask 11-00-00-915-053-A
A. Label Installation
(1) Label to be bonded to fabric impregnated with silicone synthetic rubber.
(a) Bond the label with Silicone Adhesive Sealant-General Purpose One part legacy (Material No.06CMD9) as per Vendor"s instructions.
(2) Label to be affixed to fabric impregnated with Viton synthetic rubber.
(a) Apply Silicone Adhesive Sealant-General Purpose One part legacy (Material No.06CMD9) only after the Viton coating has been treated with a bond coat comprising MB primer of the same composition.
(b) Let the primer dry for 30 minutes before you install the label.
5. Close-up(1) Label to be bonded to fabric impregnated with silicone synthetic rubber.
(a) Bond the label with Silicone Adhesive Sealant-General Purpose One part legacy (Material No.06CMD9) as per Vendor"s instructions.
(2) Label to be affixed to fabric impregnated with Viton synthetic rubber.
(a) Apply Silicone Adhesive Sealant-General Purpose One part legacy (Material No.06CMD9) only after the Viton coating has been treated with a bond coat comprising MB primer of the same composition.
(b) Let the primer dry for 30 minutes before you install the label.
Subtask 11-00-00-942-053-A
A. Make sure that the work area is clean and clear of tools and other items.