Checklist for the Return to Operation After a Storage Period
TASK 10-30-00-280-802-A
Checklist for the Return to Operation After a Storage Period
The list of all actions and their application conditions to be completed for a return to operation after a storage period is included in AMM TASK 10-30-00-554-005 (Return to Operation After a Storage Period).
This checklist must be used to do a double check of some specific actions done during AMM TASK 10-30-00-554-005 (Return to Operation After a Storage Period).
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 10-30-00-554-058-A 4. Procedure
Subtask 10-30-00-280-051-A
[Rev.10 from 2021]
2026.04.01 04:27:46 UTC
Checklist for the Return to Operation After a Storage Period
WARNING:
ALWAYS DO AMM TASK 10-30-00-554-005 (RETURN TO OPERATION AFTER A STORAGE PERIOD) BEFORE YOU DO THIS CHECKLIST. NEVER DO THIS CHECKLIST ONLY. THIS CHECKLIST IS NOT A MAINTENANCE TASK. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT CAN OCCUR.
1. Reason for the JobThe list of all actions and their application conditions to be completed for a return to operation after a storage period is included in AMM TASK 10-30-00-554-005 (Return to Operation After a Storage Period).
This checklist must be used to do a double check of some specific actions done during AMM TASK 10-30-00-554-005 (Return to Operation After a Storage Period).
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 10-30-00-554-005-A | Return to Operation After a Storage Period |
Subtask 10-30-00-554-058-A 4. Procedure
Subtask 10-30-00-280-051-A
A. Checklist for the Return to Operation After a Storage Period
(a) Ditching:
NOTE: Some maintenance actions are related to the duration of the storage period.
NOTE: All the details related to each step are given in (Ref. AMM TASK 10-30-00-554-005).
(1) Make sure that you did all these maintenance actions:(a) Ditching:
- DITCHING pushbutton switch release.
- Operational test of the fire extinguishing systems
- Check of the fire-extinguishing distribution-piping
- Check of the LP indicating circuits
- Check of the lavatory and portable fire-extinguishing bottles.
- Sample fuel for microbiological contamination analysis
- Operational test of the LP fuel shutoff-valves of the engine and APU
- Operational test of the crossfeed valves.
- Hydraulic fluid analysis
- Check of the hydraulic filters for clogging.
- General Visual Inspection (GVI) of all landing gears
- Lubrication of all landing gears and doors
- Charge pressure check of all landing gear shock-absorbers
- Functional tests of the normal extension-retraction and free fall extension
- Functional tests of the nose wheel steering.
- Wheel replacements
- GVI of the wheels, tires and brakes
- Tire pressure check and nitrogen refilling
- Functional test of the brake accumulator system
- Operational checks of the parking, normal and alternate braking systems
- BITE test of the Braking and Steering Control Unit (BSCU).
- Lubrication tasks and fluid level checks
- Cleaning and protection of the flight control cables
- Detailed inspection of the flap/slat transmission assembly
- Operational tests of the spoiler, aileron, elevator and rudder hydraulic-actuation systems
- Operational tests of the flap, slat and Trimmable Horizontal Stabilizer (THS) actuator systems.
- APU de-preservation
- Engine de-preservation.
- High power operational test of the bleed air system.
- Inspection/check of the pitot probes, static ports, Total Air Temperature (TAT) sensors and Angle of Attack (AOA) sensors
- Functional check of the heater insulation resistance of the pitot probes
- Flushing of the total pressure lines and static pressure lines
- Draining and flushing of the standby static and standby total pressure-lines
- Installation of the aircraft protection equipment.