W DOC AIRBUS | AMM A320F

GENERAL VISUAL INSPECTION OF FWD CARGO COMPARTMENT DOOR (EWIS)


TASK 05-28-20-200-004-A
GENERAL VISUAL INSPECTION OF FWD CARGO COMPARTMENT DOOR (EWIS)


ZONE: 825
1. Reason for the Job
Refer to the MPD TASK: ZL-825-02
GENERAL VISUAL INSPECTION OF FWD CARGO COMPARTMENT DOOR (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
825
FORWARD CARGO COMPARTMENT DOOR
825, 825AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 05-28-20-010-053-A
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zone 825.
   (2) Open the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
   (3) Remove the access panel 825AR and the insulation.
4. Procedure
Subtask 05-28-20-210-053-A
A. Inspection
   (1) Do a general visual inspection of the forward cargo-compartment door.
   (2) Make sure that there are no signs of corrosion, cracks or damage.
   (3) Make sure that all the installations (wiring, piping) are attached correctly.
5. Close-up
Subtask 05-28-20-410-053-A
A. Close Access
   (1) Install the insulation and the access panel 825AR.
   (2) Close the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
   (3) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 22:50:52 UTC