W DOC AIRBUS | AMM A320F

GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT DOOR INCLUDING DOOR STOPS ON FUSELAGE DOOR FRAME (EWIS)


TASK 05-28-20-200-003-A
GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT DOOR INCLUDING DOOR STOPS ON FUSELAGE DOOR FRAME (EWIS)


ZONE: 827
1. Reason for the Job
Refer to the MPD TASK: ZL-827-01
GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT DOOR INCLUDING DOOR STOPS ON FUSELAGE DOOR FRAME (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
827
BULK CARGO COMPARTMENT DOOR
827
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 52-30-00-860-006-A
Open the Bulk Cargo-Compartment Door
TASK 52-30-00-860-008-A
Close the Bulk Cargo-Compartment Door
3. Job Set-up
Subtask 05-28-20-010-052-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the bulk cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-006).
4. Procedure
Subtask 05-28-20-210-052-A ** ON A/C NOT FOR ALL
A. Inspection
   (1) Do a general visual inspection of the bulk cargo-compartment door and the stop fittings on the door frame.
   (2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
Subtask 05-28-20-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Close the bulk cargo-compartment door 827. (Ref. AMM TASK 52-30-00-860-008)
[Rev.10 from 2021] 2026.03.31 22:50:50 UTC