GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT DOOR INCLUDING DOOR STOPS ON FUSELAGE DOOR FRAME (EWIS)
TASK 05-28-20-200-003-A
GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT DOOR INCLUDING DOOR STOPS ON FUSELAGE DOOR FRAME (EWIS)
Refer to the MPD TASK: ZL-827-01
GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT DOOR INCLUDING DOOR STOPS ON FUSELAGE DOOR FRAME (EWIS)
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 05-28-20-010-052-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 05-28-20-210-052-A ** ON A/C NOT FOR ALL
Subtask 05-28-20-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 22:50:50 UTC
GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT DOOR INCLUDING DOOR STOPS ON FUSELAGE DOOR FRAME (EWIS)
ZONE: 827
1. Reason for the JobRefer to the MPD TASK: ZL-827-01
GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT DOOR INCLUDING DOOR STOPS ON FUSELAGE DOOR FRAME (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 827 | BULK CARGO COMPARTMENT DOOR |
| 827 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-30-00-860-006-A | Open the Bulk Cargo-Compartment Door |
| TASK 52-30-00-860-008-A | Close the Bulk Cargo-Compartment Door |
Subtask 05-28-20-010-052-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 05-28-20-210-052-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do a general visual inspection of the bulk cargo-compartment door and the stop fittings on the door frame.
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up(1) Do a general visual inspection of the bulk cargo-compartment door and the stop fittings on the door frame.
(2) Make sure that there are no signs of corrosion, cracks or damage.
Subtask 05-28-20-410-052-A ** ON A/C NOT FOR ALL