GENERAL VISUAL INSPECTION OF MAIN LANDING GEAR MAIN DOORS (EWIS)
TASK 05-27-30-200-004-A
GENERAL VISUAL INSPECTION OF MAIN LANDING GEAR MAIN DOORS (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-734-01
GENERAL VISUAL INSPECTION OF MAIN LANDING GEAR MAIN DOORS (EWIS)
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 05-27-30-010-053-A 4. Procedure
Subtask 05-27-30-210-053-A
Subtask 05-27-30-410-053-A
[Rev.10 from 2021]
2026.04.01 04:25:46 UTC
GENERAL VISUAL INSPECTION OF MAIN LANDING GEAR MAIN DOORS (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-734-01
GENERAL VISUAL INSPECTION OF MAIN LANDING GEAR MAIN DOORS (EWIS)
NOTE: This task can contribute to fuel savings.
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 734 | MAIN DOOR |
| 744 | MAIN DOOR |
| 734, 744 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 05-27-30-010-053-A 4. Procedure
Subtask 05-27-30-210-053-A
A. Inspection
(1) Do a general visual inspection of the main-landing-gear main doors. This inspection includes the zones 734 and 744.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the main-landing-gear main doors. This inspection includes the zones 734 and 744.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-27-30-410-053-A
Main Landing Gear and Doors