W DOC AIRBUS | AMM A320F

General Visual Inspection of Powerplants, Nacelles and Pylons


TASK 05-24-00-200-002-A
General Visual Inspection of Powerplants, Nacelles and Pylons


WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR: - THE FLIGHT CONTROLS - THE FLIGHT CONTROL SURFACES - THE LANDING GEAR AND RELATED DOORS - THE CARGO DOORS - THE ENGINES - OTHER COMPONENTS THAT MOVE. MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
ZONE: 400
1. Reason for the Job
Refer to the MPD TASK: ZL-400-02
GENERAL VISUAL INSPECTION OF POWERPLANTS, NACELLES AND PYLONS
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
 C. Referenced Information
REFERENCE
DESIGNATION
F Powerplants, Nacelles and Pylons ** ON A/C NOT FOR ALL
F Powerplants, Nacelles and Pylons ** ON A/C NOT FOR ALL
F Powerplants, Nacelles and Pylons ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 05-24-00-010-051-A
A. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 400.
WARNING: BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
   (2) Put on and attach a safety harness before you start work in the work area.
4. Procedure
Subtask 05-24-00-210-051-A
A. Inspection
F Powerplants, Nacelles and Pylons ** ON A/C NOT FOR ALL
F Powerplants, Nacelles and Pylons ** ON A/C NOT FOR ALL
F Powerplants, Nacelles and Pylons ** ON A/C NOT FOR ALL
   (1) Do a general visual inspection of the powerplants, the nacelles and the pylons (zone 400).
   (2) Make sure that there is no deterioration (damage, corrosion, leakage, cracks or chafing).
5. Close-up
Subtask 05-24-00-410-051-A
A. Close Access
   (1) Remove the access platform(s).
   (2) Remove all the fixtures, tools, test and support equipment used during this procedure.
[Rev.10 from 2021] 2026.03.31 22:49:48 UTC