W DOC AIRBUS | AMM A320F

General Visual Inspection of Upper Half of Fuselage


TASK 05-22-00-200-002-A
General Visual Inspection of Upper Half of Fuselage


ZONE: 200
1. Reason for the Job
Refer to the MPD TASK: ZL-200-02
GENERAL VISUAL INSPECTION OF UPPER HALF OF FUSELAGE
NOTE: This is an alternative method for the general visual inspection of the upper half of fuselage.
For the other method, refer to the relevant task in this page block.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 6M (20 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 05-22-00-010-053-A
A. Get Access
   (1) Put the ACCESS PLATFORM 6M (20 FT) in position at zone 200.
4. Procedure
Subtask 05-22-00-210-051-A
A. Inspection
   (1) Do a general visual inspection of the external upper half of the fuselage.
   (2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
Subtask 05-22-00-410-053-A
A. Close Access
   (1) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 22:49:08 UTC