General Visual Inspection of Aft Cargo Compartment (as far as Visible, if ACT is installed) (EWIS)
TASK 05-21-50-200-001-A
General Visual Inspection of Aft Cargo Compartment (as far as Visible, if ACT is installed) (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-151-01
GENERAL VISUAL INSPECTION OF AFT CARGO COMPARTMENT (AS FAR AS VISIBLE, IF ACT IS INSTALLED) (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-21-50-010-050-A
Subtask 05-21-50-210-050-A
Subtask 05-21-50-410-050-A
[Rev.10 from 2021]
2026.03.31 22:48:49 UTC
General Visual Inspection of Aft Cargo Compartment (as far as Visible, if ACT is installed) (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-151-01
GENERAL VISUAL INSPECTION OF AFT CARGO COMPARTMENT (AS FAR AS VISIBLE, IF ACT IS INSTALLED) (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 151 | AFT CARGO COMPARTMENT |
| 152 | AFT CARGO COMPARTMENT |
| 826 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 05-21-50-010-050-A
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 152.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 152.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
Subtask 05-21-50-210-050-A
A. Inspection
(1) Do a general visual inspection of the aft cargo compartment at zones 151 and 152 (as far as you can see, if Additional Center Tank (ACT) is installed).
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up(1) Do a general visual inspection of the aft cargo compartment at zones 151 and 152 (as far as you can see, if Additional Center Tank (ACT) is installed).
(2) Make sure that there are no signs of corrosion, cracks or damage.
Subtask 05-21-50-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).