Zonal Inspection as far as visible from the Ground of the Main Gear Well and the Hydraulics Compartment (Zones 147 and 148)
TASK 05-21-40-200-003-A
Zonal Inspection as far as visible from the Ground of the Main Gear Well and the Hydraulics Compartment (Zones 147 and 148)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 05-21-40-010-052-A 4. Procedure
Subtask 05-21-40-210-052-A
Subtask 05-21-40-410-052-A
[Rev.10 from 2021]
2026.03.31 22:48:46 UTC
Zonal Inspection as far as visible from the Ground of the Main Gear Well and the Hydraulics Compartment (Zones 147 and 148)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 148 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 734, 744 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 05-21-40-010-052-A 4. Procedure
Subtask 05-21-40-210-052-A
A. Inspection
(1) Do a general visual inspection of the main gear well and the hydraulics compartment from the ground (Zones 147 and 148).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the main gear well and the hydraulics compartment from the ground (Zones 147 and 148).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-21-40-410-052-A