Power Plant (APU)
| 49-10-01 | Power Plant (APU) |
|---|
Applicable to: -
49-10-01-A Non ETOPS flight
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| C 13.04.2026 | 1 | 0 | Yes |
(o)
May be
inoperative provided that ETOPS is not conducted.
49-10-01-B ETOPS 120 min flight
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| A | 1 | 0 | Yes |
(o)
May be inoperative for four
flights provided that ETOPS beyond 120 min is
not conducted.
49-10-01-C APU deactivated or removed
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| D 01.08.2026 | 1 | 0 | Yes |
(o)(m)
1)
2)
May be inoperative provided that:
1)
ETOPS is not conducted, and
2)
The APU is deactivated or
removed.