ATC MSG pb (If Installed)
| 46-21-03 | (If Installed) ATC MSG pb |
|---|
Applicable to: -
46-21-03-A One inoperative
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| D 01.08.2026 | 2 | 1 | Yes |
One may be inoperative.
46-21-03-B Procedures do not require ATC datalink
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| D 01.08.2026 | 2 | 0 | Yes |
(o)
One or
both may be inoperative provided that procedures do not require ATC datalink.
46-21-03-C Procedures require ATC datalink
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| C 13.04.2026 | 2 | 0 | Yes |
(o)
One or both may be inoperative
provided that alternate procedures are established and used for ATC communication.