APU AGENT SQUIB
| 26-01-01-06 | APU AGENT pb SQUIB light |
|---|
Applicable to: -
26-01-01-06-A Check of APU extinguishing system firing circuit
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| C 13.04.2026 | 1 | 0 | Yes |
(m)
May be inoperative provided that the APU extinguishing
system firing circuit is checked operative before the first flight
of each day.
26-01-01-06-B APU deactivated
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| C 13.04.2026 | 1 | 0 | Yes |
May be inoperative provided that the APU is
deactivated.