W DOC AIRBUS | MMEL ITEMS A320F

GALY & CAB Manual Load Shed System (GALY & CAB)


24-26-02GALY & CAB Manual Load Shed System (GALY & CAB pb-sw)
Applicable to: -
24-26-02-A
Repair intervalNbr installedNbr requiredPlacard
C
13.04.2026
10Yes
(m)
May be inoperative provided that all GALY & CAB loads are disconnected.

24-26-02GALY & CAB Manual Load Shed System (GALY & CAB pb-sw)
Applicable to: -
24-26-02-A All GALY & CAB loads disconnected
Repair intervalNbr installedNbr requiredPlacard
C
13.04.2026
10Yes
(m)
May be inoperative provided that all GALY & CAB loads are disconnected.

24-26-02-B COMMERCIAL supply system operative
Repair intervalNbr installedNbr requiredPlacard
C
13.04.2026
10Yes
(o)(m)
May be inoperative provided that the COMMERCIAL supply system is checked operative.