Manual Transfer to the AC BUS 2 (ALTN Function)
| 24-25-01 | Manual Transfer to the AC BUS 2 (ALTN Function) |
|---|
Applicable to: -
24-25-01-A
| Repair interval | Nbr installed | Nbr required | Placard |
|---|---|---|---|
| C 13.04.2026 | 1 | 0 | Yes |
(o)
1)
2)
3)
May be
inoperative provided that:
1)
The AC ESS FEED pb-sw is set
to NORM, and
2)
It is checked on the ELEC SD Page that the AC BUS 1 supplies the AC ESS BUS, and
3)
The TR 2 is operative.