Installation of the HPC Stage 7 Bleed Valve - Upper Right [IAE]


TASK 75-32-52-400-010-A
Installation of the HPC Stage 7 Bleed Valve - Upper Right


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T
No specific
Torque wrench: range to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.V02-126)
lockwire
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR, 452AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR, 462AR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 70-23-11-911-013-A
General Torque Tightening Techniques
TASK 71-00-00-710-017-B
Ground Test Requirements after Power Plant Module/Component Repair or Replacement Procedures
TASK 71-13-00-010-010-A
Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 71-13-00-410-010-A
Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 75-32-52-700-011-A
Functional Test of the HPC Stage 7 Bleed Valve with Test Set IAE2R19437
TASK 78-30-00-040-012-A
Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance
TASK 78-30-00-440-012-A
Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance
TASK 78-32-00-010-010-A
Opening of the Thrust Reverser Halves
TASK 78-32-00-410-010-A
Closing of the Thrust Reverser Halves
3. Job Set-up
Subtask 75-32-52-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
   (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
Subtask 75-32-52-010-057-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
   (2) Make sure that the right thrust reverser door is open (Ref. AMM TASK 78-32-00-010-010):
     (a) FOR [1000EM1] (ENGINE-1)
452AR
     (b) FOR [1000EM2] (ENGINE-2)
462AR
Subtask 75-32-52-040-050-A ** ON A/C NOT FOR ALL
C. Make sure that the thrust reverser Hydraulic Control Unit (HCU) is deactivated (Ref. AMM TASK 78-30-00-040-012).
4. Procedure
Subtask 75-32-52-630-050-A ** ON A/C NOT FOR ALL
A. Remove all the covers/caps/plugs from the openings.
Subtask 75-32-52-160-050-A ** ON A/C NOT FOR ALL
B. Make sure all the mating faces are clean.
Subtask 75-32-52-420-056-A ** ON A/C NOT FOR ALL
C. Installation of the Bleed Valve and the Silencer Assembly

PRE SBE 75-0071 and PRE SBE 75-0105

   (1) Put the bleed valve (7) in position on the support duct flange.
   (2) Align the air operation connector on the bleed valve (7) with the air operation tube (8).
   (3) Install the bolts (2) and the nuts (1) which attach the bleed valve (7) to the support duct flange.
   (4) TORQUE the nuts (1) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Connect the air operation tube (8).
     (a) Attach the tube (8) to the bleed valve connector.
     (b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (c) Safety the connector with the lockwire (Material No.V02-126) .
   (6) Install the seal carrier (6) and the silencer (5).
     (a) Hold the seal carrier (6) and the silencer (5) in position on the bleed valve (7).
     (b) Attach the seal carrier (6) and the silencer (5) to the bleed valve (7) with the bolts (4) and the nuts (3).
     (c) TORQUE the nuts (3) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).

END OF PRE SBE 75-0071 and END OF PRE SBE 75-0105

Subtask 75-32-52-420-057-A ** ON A/C NOT FOR ALL
D. Installation of the Bleed Valve and the Silencer Assembly

POST SBE 75-0071, PRE SBE 75-0092 and PRE SBE 75-0105

   (1) Put the bleed valve (12) in position on the support duct flange.
   (2) Align the air operation connector on the valve with the air operation tube (8).
   (3) Install the bolts (50) and the nuts (51) which attach the bleed valve (12) to the support duct flange.
   (4) TORQUE the nuts (51) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Connect the air operation tube (8).
     (a) Attach the tube (8) to the bleed valve connector.
     (b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (c) Safety the connector with the lockwire (Material No.V02-126) .
   (6) Install the silencer assembly (11).
     (a) Hold the silencer assembly (11) in position on the bleed valve (12).
     (b) Attach the silencer assembly (11) to the valve (12) with the bolts (10) and the nuts (9).
     (c) TORQUE the nuts (9) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).

END OF POST SBE 75-0071, END OF PRE SBE 75-0092 and END OF PRE SBE 75-0105

Subtask 75-32-52-420-058-A ** ON A/C NOT FOR ALL
E. Installation of the Bleed Valve and the Silencer Assembly

POST SBE 75-0105 and PRE SBE 75-0071

   (1) Put the bleed valve (22) in position on the support duct flange.
   (2) Align the air operation connector on the valve (22) with the air operation tube (8).
   (3) Install the bolts (26) and the nuts (27) which attach the valve to the support duct flange.
   (4) TORQUE the nuts (27) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Connect the air operation tube (8).
     (a) Attach the tube (8) to the bleed valve (22) connector.
     (b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (c) Safety the connector with the lockwire (Material No.V02-126) .
   (6) Install the seal carrier (25) and the silencer (24).
     (a) Hold the seal carrier (25) and the silencer (24) in position on the bleed valve (22).
     (b) Attach the seal carrier (25) and the silencer (24) to the bleed valve (22) with the bolts (23) and the nuts (28).
     (c) TORQUE the nuts (28) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).

END OF POST SBE 75-0105 and END OF PRE SBE 75-0071

Subtask 75-32-52-420-059-A ** ON A/C NOT FOR ALL
F. Installation of the Bleed Valve and the Silencer Assembly

POST SBE 75-0105 and POST SBE 75-0071

   (1) Put the bleed valve (34) in position on the support duct flange.
   (2) Align the air operation connector on the bleed valve with the air operation tube (8).
   (3) Install the bolts (31) and the nuts (32) which attach the bleed valve (34) to the support duct flange.
   (4) TORQUE the nuts (32) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Connect the air operation tube (8).
     (a) Attach the tube (8) to the bleed valve connector.
     (b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (c) Safety the connector with the lockwire (Material No.V02-126) .
   (6) Install the silencer assembly (29).
     (a) Hold the silencer assembly (29) in position on the bleed valve (34).
     (b) Attach the silencer assembly (29) to the valve (34) with the bolts (30) and the nuts (33).
     (c) TORQUE the nuts (33) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).

END OF POST SBE 75-0105 and END OF POST SBE 75-0071

Subtask 75-32-52-420-060-A ** ON A/C NOT FOR ALL
G. Installation of the Bleed Valve and the Silencer Assembly

POST SBE 75-0093 and PRE SBE 75-0105

   (1) Put the bleed valve (20) in position on the support duct flange.
   (2) Align the air operation connector on the valve (20) with the air operation tube (8).
   (3) Install the bolts (52) and the nuts (53) which attach the bleed valve (20) to the support duct flange.
   (4) TORQUE the nuts (53) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Connect the air operation tube (8).
     (a) Attach the tube (8) to the bleed valve connector.
     (b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (c) Safety the connector with the lockwire (Material No.V02-126) .
   (6) Install the silencer assembly (18).
     (a) Hold the silencer assembly (18) in position on the bleed valve (20).
     (b) Attach the silencer assembly (18) to the bleed valve (20) with the bolts (19) and the nuts (21).
     (c) TORQUE the nuts (21) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).

END OF POST SBE 75-0093 and END OF PRE SBE 75-0105

Subtask 75-32-52-420-061-A ** ON A/C NOT FOR ALL
H. Installation of the Bleed Valve with the Spacer and the Silencer Assembly

POST SBE 75-0092, PRE SBE 75-0093 and PRE SBE 75-0105

   (1) Put the bleed valve (16) in position on the support duct flange.
   (2) Align the air operation connector on the bleed valve (16) with the air operation tube (8).
   (3) Install the bolts (48) and the nuts (49) which attach the bleed valve (16) to the support duct flange.
   (4) TORQUE the nuts to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Connect the air operation tube (8).
     (a) Attach the tube (8) to the bleed valve connector.
     (b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (c) Safety the connector with the lockwire (Material No.V02-126) .
   (6) Install the silencer assembly (14) with the spacer (13).
     (a) Hold the spacer (13) and the silencer assembly (14) in position on the bleed valve (16).
     (b) Attach the spacer (13) and the silencer assembly (14) to the bleed valve (16) with the bolts (15) and the nuts (17).
     (c) TORQUE the nuts (17) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).

END OF POST SBE 75-0092, END OF PRE SBE 75-0093 and END OF PRE SBE 75-0105

Subtask 75-32-52-420-062-A ** ON A/C NOT FOR ALL
I. Installation of the Bleed Valve with the Spacer and the Silencer Assembly

POST SBE 75-0092 and POST SBE 75-0105

   (1) Put the bleed valve (41) in position on the support duct flange.
   (2) Align the air operation connector on the bleed valve (41) with the air operation tube (8).
   (3) Install the bolts (38) and the nuts (39) which attach the bleed valve (41) to the support duct flange.
   (4) TORQUE the nuts (39) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Connect the air operation tube (8).
     (a) Attach the tube (8) to the bleed valve connector.
     (b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (c) Safety the connector with the lockwire (Material No.V02-126) .
   (6) Install the silencer assembly (35) with the spacer (37).
     (a) Hold the spacer (37) and the silencer assembly (35) in position on the bleed valve (35).
     (b) Attach the spacer (37) and the silencer assembly (35) to the bleed valve (41) with the bolts (36) and the nuts (40).
     (c) TORQUE the nuts (40) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).

END OF POST SBE 75-0092 and END OF POST SBE 75-0105

Subtask 75-32-52-420-063-A ** ON A/C NOT FOR ALL
J. Installation of the Bleed Valve and the Silencer Assembly

POST SBE 75-0093 and POST SBE 75-0105

   (1) Put the bleed valve (47) in position on the support duct flange.
   (2) Align the air operation connector on the valve (47) with the air operation tube (8).
   (3) Install the bolts (44) and the nuts (45) which attach the bleed valve (47) to the support duct flange.
   (4) TORQUE the nuts (45) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Connect the air operation tube (8).
     (a) Attach the tube (8) to the bleed valve connector.
     (b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (c) Safety the connector with the lockwire (Material No.V02-126) .
   (6) Install the silencer assembly (42).
     (a) Hold the silencer assembly (42) in position on the bleed valve (47).
     (b) Attach the silencer assembly (42) to the valve (47) with the bolts (43) and the nuts (46).
     (c) TORQUE the nuts (46) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).

END OF POST SBE 75-0093 and END OF POST SBE 75-0105

5. Close-up
Subtask 75-32-52-410-057-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the right thrust reverser half (Ref. AMM TASK 78-32-00-410-010):
     (a) FOR [1000EM1] (ENGINE-1)
452AR
     (b) FOR [1000EM2] (ENGINE-2)
462AR
Subtask 75-32-52-440-051-A ** ON A/C NOT FOR ALL
B. Activate the thrust reverser HCU (Ref. AMM TASK 78-30-00-440-012).
Subtask 75-32-52-410-051-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the access platform(s).
Subtask 75-32-52-720-050-C ** ON A/C NOT FOR ALL
D. Do a test of the HPC stage 7 bleed valve (Ref. AMM TASK 75-32-52-700-011) or (Ref. AMM TASK 71-00-00-710-017).