Borescope Inspection of the High Pressure Turbine Nozzle [CFMI]
TASK 72-51-00-290-003-A
Borescope Inspection of the High Pressure Turbine Nozzle
1. Reason for the Job
Refer to the MPD TASK: 725100-C1
BORESCOPE INSPECTION OF HIGH PRESSURE TURBINE NOZZLE
2. Job Set-up
Subtask 72-51-00-869-050-A ** ON A/C NOT FOR ALL
Subtask 72-51-00-290-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:33:47 UTC
Borescope Inspection of the High Pressure Turbine Nozzle
1. Reason for the Job
Refer to the MPD TASK: 725100-C1
BORESCOPE INSPECTION OF HIGH PRESSURE TURBINE NOZZLE
2. Job Set-up
Subtask 72-51-00-869-050-A ** ON A/C NOT FOR ALL
A. Not Applicable
3. ProcedureSubtask 72-51-00-290-051-A ** ON A/C NOT FOR ALL
A. Do a borescope inspection
PRE SB (CFM56-5) 72-207
(1) Do a borescope inspection of the high Presssure Turbine Nozzle as per SB (CFM56-5) 72-170.
POST SB (CFM56-5) 72-207
(2) Not Applicable
PRE SB (CFM56-5) 72-207
(1) Do a borescope inspection of the high Presssure Turbine Nozzle as per SB (CFM56-5) 72-170.
POST SB (CFM56-5) 72-207
(2) Not Applicable