Inspection/Check of the PS3 Line [CFMI]
TASK 72-00-00-200-029-A
Inspection/Check of the PS3 Line
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 72-00-00-941-060-A ** ON A/C NOT FOR ALL
Subtask 72-00-00-410-065-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:33:36 UTC
Inspection/Check of the PS3 Line
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-A | Closing of the Fan Cowl Doors |
| TASK 78-30-00-081-041-A | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-A | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-A | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-A | Closing of the Thrust Reverser Doors |
Subtask 72-00-00-941-060-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 72-00-00-010-065-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(4) Put the ACCESS PLATFORM 1M(3 FT) in position.
Subtask 72-00-00-040-056-A ** ON A/C NOT FOR ALL Subtask 72-00-00-010-066-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(4) Put the ACCESS PLATFORM 1M(3 FT) in position.
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
CAUTION:
USE 2 WRENCHES TO REMOVE/INSTALL THE TUBE UNION NUT: ONE TO HOLD THE FITTING, THE OTHER TO LOOSE/TORQUE THE NUT. OTHERWISE, DAMAGE TO THE HARDWARE CAN OCCUR.
Subtask 72-00-00-210-060-A ** ON A/C NOT FOR ALL A. Visual Inspection of the PS3 Line
(1) Inspect the PS3 line as follows:
5. Close-up(1) Inspect the PS3 line as follows:
| INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.The tubes for: | | |
| Not serviceable | Replace the tube. |
| 4 per lineal foot, spaced at least 1 in. (25,4 mm) apart, provided depht of each dent does not exceed 20 percent of tube outer diameter for straight section or 10 percent of tube outer diameter for bend section. | |
| Lenght shall not be greater than 3 times the tube outer diameter, and contour change shall not exceed 20 percent of tube outer diameter for straight section or 10 percent of tube outer diameter for bend section. | |
| 0.005 in. (0,13 mm) max. depht. | |
| 2.The hose for: | | |
| 3 broken wires per plait, and no more than 6 broken wires per assembly, or per lineal 12 in. (305 mm) of hose. | |
| Not serviceable | Replace the hose |
| Not serviceable | Replace the hose. |
| Any number, provided maximum depth does not exceed one-half of sleeve thickness. | |
Subtask 72-00-00-410-065-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-00-00-440-056-A ** ON A/C NOT FOR ALL Subtask 72-00-00-410-066-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Inspection/Check of the PS3 Line