Installation of the HJ9B Engine Wiring Harness [CFML]
TASK 71-51-43-400-814-A
Installation of the HJ9B Engine Wiring Harness
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 71-51-43-941-098-A
Subtask 71-51-43-420-091-A
Subtask 71-51-43-410-090-A
[Rev.10 from 2021]
2026.04.02 06:33:30 UTC
Installation of the HJ9B Engine Wiring Harness
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 400
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - PROTECTION |
| No specific | AR | COVER - PROTECTION |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 46.2 and 41.8 lbf.in (0.52 and 0.47 m.daN ) ![]() |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 400 | POWER PLANT, NACELLES AND PYLONS |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-803-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-803-A | Closing of the Fan Cowl Doors |
Subtask 71-51-43-941-098-A
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Put the WARNING NOTICE(S) in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put the WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
Subtask 71-51-43-010-123-A 4. Procedure(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Put the WARNING NOTICE(S) in position to tell persons not to operate:
- The ENG/MODE selector switch
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put the WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
Subtask 71-51-43-420-091-A
A. Installation of the HJ9B Engine Wiring Harness (1)
(3) Connect the HJ9B Engine Wiring Harness (1) to the Engine Electronic Calculator (EEC) Chanel B J9 connector (2).
(4) Install the clamp (5) on the HJ9B Engine Wiring Harness (1).
(5) Attach the clamp (5) and the self-locking nut (10) to the bracket (4) with the bolt (3) and tighten by hand.
(6) Make sure that the HJ9B Engine Wiring Harness (1) is not twisted.
(7) Attach the HJ9B Engine Wiring Harness (1) to the clip (6).
(8) Remove the security cap (7) from the connector of the HJ9B Engine Wiring Harness (1).
(9) Attach the HJ9B Engine Wiring Harness connector socket (1) to the bracket assy (9) with the two bolts (8) and tighten by hand.
(10) TORQUE the bolt (3) and the two bolts (8) to between 46.2 and 41.8 lbf.in (0.52 and 0.47 m.daN )
without any additional lubricant.
(11) Install the security cap (7) on the HJ9B Engine Wiring Harness connector (1).
5. Close-upCAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
CAUTION:
USE PLIERS THAT HAVE TEFLON JAWS TO TIGHTEN OR LOOSEN THE ELECTRICAL CONNECTORS. DO NOT USE PLIERS THAT HAVE METAL JAWS. METAL JAWS CAN CAUSE DAMAGE TO THE ELECTRICAL CONNECTORS.
(1) Remove all the COVER - PROTECTION and the CAP - PROTECTION from all open ports and disconnected connectors. CAUTION:
DO NOT BEND OR TWIST THE HARNESS TOO MUCH. IF YOU DO, DAMAGE TO THE HARNESS CAN OCCUR.
(2) Engage the HJ9B Engine Wiring Harness (1) to put it in position on the engine. Do not turn or pull the HJ9B Engine Wiring Harness (1). (3) Connect the HJ9B Engine Wiring Harness (1) to the Engine Electronic Calculator (EEC) Chanel B J9 connector (2).
(4) Install the clamp (5) on the HJ9B Engine Wiring Harness (1).
(5) Attach the clamp (5) and the self-locking nut (10) to the bracket (4) with the bolt (3) and tighten by hand.
(6) Make sure that the HJ9B Engine Wiring Harness (1) is not twisted.
(7) Attach the HJ9B Engine Wiring Harness (1) to the clip (6).
(8) Remove the security cap (7) from the connector of the HJ9B Engine Wiring Harness (1).
(9) Attach the HJ9B Engine Wiring Harness connector socket (1) to the bracket assy (9) with the two bolts (8) and tighten by hand.
(10) TORQUE the bolt (3) and the two bolts (8) to between 46.2 and 41.8 lbf.in (0.52 and 0.47 m.daN )
without any additional lubricant. (11) Install the security cap (7) on the HJ9B Engine Wiring Harness connector (1).
Subtask 71-51-43-410-090-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803).
(3) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803).
(3) Remove the WARNING NOTICE(S).
HJ9B Engine Wiring Harness