W DOC AIRBUS | AMM A320F

Installation of the ECU (Channel B) Harness [CFMB]


TASK 71-51-43-400-047-A
Installation of the ECU (Channel B) Harness


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 400
FIN: 4212KS ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T
No specific
Torque wrench: range to between 30 and 25 lbf.in (0.34 and 0.28 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.CP2739)
tape
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 22-97-00-710-001-A
Operational Test of the LAND CAT III Capability
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
TASK 34-10-00-860-004-A
Inertial Reference (IR) Alignment-Procedure
TASK 34-10-00-860-004-A-01
Automatic Inertial Reference (IR) Alignment-Procedure
TASK 34-10-00-860-004-A-02
Inertial Reference (IR) Alignment-Procedure to do a Check of the Links between each Flight Management and Guidance Computer (FMGC) and the three Air Data/Inertial Reference Units (ADIRUs)
TASK 70-60-00-910-041-A
Nacelle Maintenance Practices
TASK 71-13-00-010-040-B
Opening of the Fan Cowl Doors
TASK 71-13-00-410-040-B
Closing of the Fan Cowl Doors
TASK 73-21-60-720-040-B
Functional Test of the Electronic Control Unit (ECU)
3. Job Set-up
Subtask 71-51-43-860-065-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
   (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
   (3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 71-51-43-010-071-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-040):
     (a) FOR [1000EM1] (ENGINE-1)
437AL, 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL, 448AR.
Subtask 71-51-43-865-072-A ** ON A/C NOT FOR ALL
WARNING: OPEN THE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3) BEFORE ENG1(2)FADEC A and EIU 1(2) C/B'S 2KS1 AND 2KS2. IF YOU DO NOT OBEY THIS SEQUENCE:
  • THE PROBES WILL BECOME TOO HOT.
  • THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUCOM/CVR/SPLY2RKE14
49VUCOM/CVR/CTL4RKE13
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PITOT/13DA1D02
** ON A/C NOT FOR ALL
49VUANTI ICE/RAIN/RPLNT/CAPT1DB1D01
** ON A/C NOT FOR ALL
49VUCOM/CVR/SPLY23RKE14
49VUCOM/CVR/CTL26RKE13
** ON A/C NOT FOR ALL
121VURCDR/DFDR7TUK16
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUANTI ICE/WINDOWS/R4DG2W14
122VUANTI ICE/WINDOWS/L4DG1X14
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
** ON A/C NOT FOR ALL
122VUANTI ICE/RAIN/RPLNT/F/O1DB2W11
** ON A/C NOT FOR ALL
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
FOR FIN: 1000EM1 (ENGINE1)
49VUENGINE/1/FIRE DET/LOOP A7WD1A06
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1/FIRE DET/LOOP B8WD1Q38
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
122VUELEC/GCU/12XU1T26
FOR FIN: 1000EM2 (ENGINE2)
49VUENGINE/2/FIRE DET/LOOP B8WD2A07
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
121VUENGINE/ENG2/FADEC B4KS2Q40
121VUENGINE/ENG2/FIRE DET/LOOP A7WD2Q39
122VUELEC/GCU/22XU2T27
4. Procedure
Subtask 71-51-43-420-057-A ** ON A/C NOT FOR ALL
A. Installation of the Electronic Control Unit (ECU) (Channel B) Harness
NOTE: For the recommended procedure for the installation of the wire harness (Ref. AMM TASK 70-60-00-910-041).
NOTE: To tighten the flip-lock clamps and line blocks, turn the captive screws or captive bolts 1/4 turn clockwise to engage the cam nuts.
   (1) Remove the COVER - PROTECTION protective covers from the electrical connectors.
   (2) Put the electrical harness (5) in position on the engine.
   (3) Connect electrical connectors 403VC-A and 407VC-A to the pylon junction box.
   (4) Connect electrical connector 4003VC-A to the junction box.
   (5) Put the harness (5) into the flip-lock clamps (10) and (15).
   (6) Put the harness (5) into the rubber supports of the line blocks.

BEFORE SPIB NO. CFM02255MW1

   (7) If removed, put the rubber supports in the line blocks (20) and (25) attached to the brackets at station 167.
   (8) If removed, put the rubber supports in the line block (30) attached to the bracket at station 174.
   (9) If removed, put the rubber supports in the line block (35) attached to the brackets at stations 176, 185 and 191.
   (10) Make sure that the harness (5) is correctly installed on the engine.
   (11) Close the line blocks (20), (25), (30) and (35) and tighten the captive bolts.
   (12) Tighten the captive screws on the flip-lock clamps (10) and (15).
   (13) Put the clamps (50) on the harness (5). Attach the clamps to the brackets at station 199 with the bolts (40) and the nuts (45).
   (14) TORQUE the nuts (45) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T.
   (15) Put the harness (5) into the rubber supports of the line blocks (25) and (65).
   (16) If removed, put the rubber supports in the line blocks (25) and (65) attached to the brackets at station 167.
   (17) Make sure that the harness (5) is correctly installed on the engine.
   (18) Close the line blocks (25) and (65) and tighten the captive bolts.

CONFIG-1

   (19) Put the harness (5) into the flip-lock clamp (55) near the ignition exciters and tighten the captive bolt.

END OF CONFIG-1

CONFIG-2

   (20) Put the harness (5) into the flip-lock clamp (60) near the ignition exciters and tighten the captive bolt.

END OF CONFIG-2

   (21) Connect electrical connector 4000JH2-A to ignition exciter B.
   (22) Connect electrical connectors 4000KS-J2 and 4000KS-J4 to the ECU.
NOTE: The wire harnesses for connectors 4000KS-J4 and 4000KS-J6 may touch as shown on
(Detail B)
   (23) Put the harness (5) into the two flip-lock clamps (60) that are attached to the brackets at station 191.
   (24) Put the harness (5) into the flip-lock clamp (80) that is attached to the bracket at station 191.
   (25) Put the harness (5) into the two flip-lock clamps (55) that are attached to the brackets at station 191.

AFTER SPIB NO. CFM02255MW1

   (26) Make sure that the harness (5) is correctly installed on the engine.
   (27) Install the clamps and bolts (22) that attach the harness (5) to the brackets at station 167.
   (28) Install the clamps, bolt and anti-rotation lug (23) that attach the harness (5) to the brackets at station 167.
   (29) Install the clamps, bolt and anti-rotation lug (27) that attach the harness (5) to the brackets at station 167.
   (30) Install the clamps and bolt (32) that attach the harness (5) to the brackets at station 174.
   (31) Install the clamps, bolts and anti-rotation lugs (37) that attach the harness (5) to the brackets at station 176, 185 and 191.
   (32) Tighten the captive screws on the flip-lock clamps (10) and (15).
   (33) Put the clamps (50) on the harness (5). Attach the clamps to the brackets at station 199 with the bolts (40) and the nuts (45).
   (34) TORQUE the nuts (45) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T.
   (35) Put the harness (5) into the rubber supports of the line block (25).
   (36) Install the clamps and bolt (28) that attach the harness (5) to the bracket.
   (37) Install the clamps and bolt (67) that attach the harness (5) to the bracket.
   (38) Install the clamps, bolt and anti-rotation lug (68) that attach the harness (5) to the bracket.
   (39) Install the clamp, bolt and anti-rotation lug (57) near ignition exciter B.
   (40) Connect electrical connector 4000JH2-A to ignition exciter B.
   (41) Connect electrical connectors 4000KS-J2 and 4000KS-J4 to the ECU.
NOTE: The wire harness for connectors 4000KS-J4 and 4000KS-J6 may touch as shown on
(Detail B)
   (42) Install the clamps and bolts (62) that attach the harness (5) to the brackets at station 191.
   (43) Install the clamp and bolt (82) that attach the harness (5) to the bracket at station 191.
   (44) Put the harness (5) into the flip-lock clamp (55) attached to the bracket at station 191.
   (45) Install the clamp and bolt (57) that attach the harness (5) to the brackets at station 191.
   (46) TORQUE the bolts (22), (23), (27), (28), (32), (37), (57), (62), (67), (68) and (82) to between 30 and 25 lbf.in (0.34 and 0.28 m.daN ) T.

END OF SPIB NO. CFM02255MW1

   (47) Connect electrical connector 4000EV-C to the fan speed sensor (N1).

PRE SB RA32171-6

   (48) Put the harness (5) into the flip-lock clamp (55) that is attached to the bracket at station 185.

POST SB RA32171-6

   (49) Put the clamp (50) on the harness (5). Use the bolt (40) to attach the clamp (50) to the bracket at station 185.
   (50) TORQUE the bolt (40) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
T.

END OF SB RA32171-6

   (50) Put the two clamps (50) on the harness (5). Attach the clamps (50) to the starter bracket with the bolts (70) and nuts (75).
   (51) Put the clamp (50) on the harness (5). Use the bolt (40) and nut (45) to attach the clamp to the gearbox bracket.
   (52) Put the clamp (50) on the harness (5). Use the bolt (85) and nut (90) to attach the clamp (50) and the fire detector clamp to the gearbox bracket.
(Detail C)
   (53) TORQUE the nuts (45), (80) and (90) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T.
   (54) Connect electrical connector 4001EV-C to the gas generator speed sensor (N2).
   (55) Tighten the captive screws on the flip-lock clamps.
   (56) Examine the harness installation and make sure that all the flip-lock clamps, line blocks and clamps are installed correctly.

POST SB RA32071-132

   (57) Apply the tape.
CAUTION: YOU MUST WIND THE TWO HARNESSES WITH TAPE (CP 2739) IF THEY TOUCH. IF YOU DO NOT WIND THE HARNESSES WITH TAPE IT CAN DAMAGE THE HARNESSES.
     (a) Wind the tape (Material No.
CP2739) on the two harnesses in the areas shown.
       1 Wind the tape so that each wind overlaps the last wind by half the width of the tape.

END OF SB RA32071-132

Subtask 71-51-43-865-073-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUCOM/CVR/SPLY2RKE14
49VUCOM/CVR/CTL4RKE13
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PITOT/13DA1D02
** ON A/C NOT FOR ALL
49VUANTI ICE/RAIN/RPLNT/CAPT1DB1D01
** ON A/C NOT FOR ALL
49VUCOM/CVR/SPLY23RKE14
49VUCOM/CVR/CTL26RKE13
** ON A/C NOT FOR ALL
121VURCDR/DFDR7TUK16
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUANTI ICE/WINDOWS/R4DG2W14
122VUANTI ICE/WINDOWS/L4DG1X14
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
** ON A/C NOT FOR ALL
122VUANTI ICE/RAIN/RPLNT/F/O1DB2W11
** ON A/C NOT FOR ALL
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
FOR FIN: 1000EM1 (ENGINE1)
49VUENGINE/1/FIRE DET/LOOP A7WD1A06
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1/FIRE DET/LOOP B8WD1Q38
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
122VUELEC/GCU/12XU1T26
FOR FIN: 1000EM2 (ENGINE2)
49VUENGINE/2/FIRE DET/LOOP B8WD2A07
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
121VUENGINE/ENG2/FADEC B4KS2Q40
121VUENGINE/ENG2/FIRE DET/LOOP A7WD2Q39
122VUELEC/GCU/22XU2T27
Subtask 71-51-43-861-054-A ** ON A/C NOT FOR ALL
C. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002)
Subtask 71-51-43-860-066-A ** ON A/C NOT FOR ALL
D. Do the EIS start procedure (for the lower display of the ECAM system only). (Ref. AMM TASK 31-60-00-860-001).
Subtask 71-51-43-720-051-A ** ON A/C NOT FOR ALL
E. Do a functional test of the ECU (Ref. AMM TASK 73-21-60-720-040) .
Subtask 71-51-43-710-066-A ** ON A/C NOT FOR ALL
F. If you operate the aircraft in actual CAT III conditions, do these tests:
  • Make sure that there is no CAT 3 DUAL INOP message on the lower ECAM DU of the maintenance panel 50VU with FADEC GND PWR 1 & 2 pushbutton switches pushed (ON legends on) and 3 IR'S aligned (Ref. AMM TASK 34-10-00-860-004)
  • Do the operational test of the LAND CAT III Capability (Ref. AMM TASK 22-97-00-710-001).
5. Close-up
Subtask 71-51-43-860-067-A ** ON A/C NOT FOR ALL
A. Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002)
Subtask 71-51-43-862-054-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft circuits (Ref. AMM TASK 24-41-00-862-002)
Subtask 71-51-43-410-057-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-040):
     (a) FOR [1000EM1] (ENGINE-1)
437AL, 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL, 448AR.
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).