Installation of the Thrust Reverser (Channel A and B) Harness [CFMB]
TASK 71-51-43-400-044-A
Installation of the Thrust Reverser (Channel A and B) Harness
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 71-51-43-860-056-A ** ON A/C NOT FOR ALL
4. Procedure
Subtask 71-51-43-420-054-B ** ON A/C NOT FOR ALL
Subtask 71-51-43-862-051-A ** ON A/C NOT FOR ALL Subtask 71-51-43-410-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:32:23 UTC
Installation of the Thrust Reverser (Channel A and B) Harness
FIN: 4200KS ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) ![]() |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 70-60-00-910-041-A | Nacelle Maintenance Practices |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 78-31-00-710-042-A | Operational Test of the Thrust Reverser System |
Subtask 71-51-43-860-056-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 71-51-43-010-068-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
B. Get Access
(1) Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 71-51-43-865-063-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
WARNING:
OPEN THE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3) BEFORE ENG1(2)FADEC A and EIU 1(2) C/B'S 2KS1 AND 2KS2. IF YOU DO NOT OBEY THIS SEQUENCE:
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:- THE PROBES WILL BECOME TOO HOT.
- THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CVR/SPLY | 2RK | E14 |
| 49VU | COM/CVR/CTL | 4RK | E13 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | ENGINE/1 AND 2/IGN/SYS A | 1JH | A03 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | ANTI ICE/RAIN/RPLNT/CAPT | 1DB1 | D01 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CVR/SPLY | 23RK | E14 |
| 49VU | COM/CVR/CTL | 26RK | E13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | RCDR/DFDR | 7TU | K16 |
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| 122VU | ANTI ICE/WINDOWS/R | 4DG2 | W14 |
| 122VU | ANTI ICE/WINDOWS/L | 4DG1 | X14 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | ANTI ICE/RAIN/RPLNT/F/O | 1DB2 | W11 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | ENGINE/1/FIRE DET/LOOP A | 7WD1 | A06 |
| 49VU | ENGINE/1/FADEC A/AND EIU 1 | 2KS1 | A04 |
| 121VU | ENGINE/IGN/ENG1/SYS B | 3JH1 | P41 |
| 121VU | ENGINE/IGN/ENG1/SYS A BAT | 2JH1 | P39 |
| 121VU | ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B | 2WE1 | Q44 |
| 121VU | ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A | 1WE1 | Q43 |
| 121VU | ENGINE/ENG1/FIRE DET/LOOP B | 8WD1 | Q38 |
| 121VU | ENGINE/ENG1/FADEC B/AND EIU 1 | 4KS1 | R41 |
| 122VU | ELEC/GCU/1 | 2XU1 | T26 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 49VU | ENGINE/2/FIRE DET/LOOP B | 8WD2 | A07 |
| 49VU | ENGINE/2/FADEC A/AND EIU 2 | 2KS2 | A05 |
| 121VU | ENGINE/IGN/ENG2/SYS B | 3JH2 | P42 |
| 121VU | ENGINE/IGN/ENG2/SYS A BAT | 2JH2 | P40 |
| 121VU | ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B | 2WE2 | Q42 |
| 121VU | ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A | 1WE2 | Q41 |
| 121VU | ENGINE/ENG2/FADEC B | 4KS2 | Q40 |
| 121VU | ENGINE/ENG2/FIRE DET/LOOP A | 7WD2 | Q39 |
| 122VU | ELEC/GCU/2 | 2XU2 | T27 |
Subtask 71-51-43-420-054-B ** ON A/C NOT FOR ALL
A. Installation of the Thrust Reverser (Channel A and B) Harness
(2) Put the electrical harness (30) in position on the engine.
(3) Connect the electrical connectors 4101KS-A, 4101KS-B and 4102KS-A to the hydraulic control unit. Tighten the connectors with your hand plus one-eighth turn.
(4) Put the clamp (65) on the harness for connector 4101KS-B.
(5) Attach the clamps (65) and (70) to the bracket on the HCU with the screw (55) and nut (60).
(6) TORQUE the nut (60) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
.
BEFORE SPIB NO. CFM02255MW1
(7) Put the electrical harness (30) into the rubber supports and the flip-lock clamps (5), (10) and (40).
(8) Put the rubber supports in the line blocks (35).
(9) Attach the junction box part of the harness (30) to the bracket with the bolts (25), the washers (20) and the nuts (15).
(10) TORQUE the nuts (15) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
.
(11) Connect the electrical connectors 4003VC, 4004VC, 4006VC and 4007VC to the junction box. Tighten the connectors with your hand plus one-eighth turn.
(12) Make sure that the harness (30) is correctly installed on the engine.
(13) Close the line blocks (35) and tighten the captive bolts.
(14) Tighten the captive screws on the flip-lock clamps (5), (10) and (40).
AFTER SPIB NO. CFM02255MW1
(15) Put the electrical harness (30) into the rubber support and the flip-lock clamp (5).
(16) Put the rubber support in the line block (35).
(17) Put the bolts and clamps (12) and (42) on the electrical harness (30) and install on the engine brackets.
(18) Put the bolts, anti-rotation lug and clamps (37) on the electrical harness (30) and install on the engine brackets.
(19) Attach the junction box part of the harness (30) to the bracket with the bolts (25), the washers (20) and the nuts (15).
(20) TORQUE the nuts (15) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
.
(21) Connect the electrical connectors 4003VC, 4004VC, 4006VC and 4007VC to the junction box. Tighten the connectors with your hand plus one-eighth turn.
(22) Make sure that the harness (30) is correctly installed on the engine.
(23) TORQUE the bolts (12) and (42) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
.
(24) TORQUE the bolts (37) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
.
(25) Close the line blocks (35) and tighten the captive bolts.
(26) Tighten the captive screws on the flip-lock clamps (5).
END SPIB NO. CFM02255MW1
(27) On the top left side of the engine, connect the electrical connectors 4100KS-A and 4100KS-B to the thrust reverser junction box. Tighten the connectors with your hand plus one-eighth turn.
(28) Attach the harness (30) to the bracket with the clamp (50) and the bolt (45).
(29) TORQUE the bolt (45) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
.
(30) Put the harness into the flip-lock clamps (5) and tighten the captive screws.
Subtask 71-51-43-865-064-A ** ON A/C NOT FOR ALL NOTE: For the recommended procedure for the installation of the wire harness (Ref. AMM TASK 70-60-00-910-041).
NOTE: To tighten the flip-lock clamps and line blocks, turn the captive screws or captive bolts 1/4 turn clockwise to engage the cam nuts.
(1) Remove the protective covers from the electrical connectors on the harness (30), the hydraulic control unit, and the thrust reverser junction box. (2) Put the electrical harness (30) in position on the engine.
(3) Connect the electrical connectors 4101KS-A, 4101KS-B and 4102KS-A to the hydraulic control unit. Tighten the connectors with your hand plus one-eighth turn.
(4) Put the clamp (65) on the harness for connector 4101KS-B.
(5) Attach the clamps (65) and (70) to the bracket on the HCU with the screw (55) and nut (60).
(6) TORQUE the nut (60) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
. BEFORE SPIB NO. CFM02255MW1
(7) Put the electrical harness (30) into the rubber supports and the flip-lock clamps (5), (10) and (40).
(8) Put the rubber supports in the line blocks (35).
(9) Attach the junction box part of the harness (30) to the bracket with the bolts (25), the washers (20) and the nuts (15).
(10) TORQUE the nuts (15) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
. (11) Connect the electrical connectors 4003VC, 4004VC, 4006VC and 4007VC to the junction box. Tighten the connectors with your hand plus one-eighth turn.
(12) Make sure that the harness (30) is correctly installed on the engine.
(13) Close the line blocks (35) and tighten the captive bolts.
(14) Tighten the captive screws on the flip-lock clamps (5), (10) and (40).
AFTER SPIB NO. CFM02255MW1
(15) Put the electrical harness (30) into the rubber support and the flip-lock clamp (5).
(16) Put the rubber support in the line block (35).
(17) Put the bolts and clamps (12) and (42) on the electrical harness (30) and install on the engine brackets.
(18) Put the bolts, anti-rotation lug and clamps (37) on the electrical harness (30) and install on the engine brackets.
(19) Attach the junction box part of the harness (30) to the bracket with the bolts (25), the washers (20) and the nuts (15).
(20) TORQUE the nuts (15) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
. (21) Connect the electrical connectors 4003VC, 4004VC, 4006VC and 4007VC to the junction box. Tighten the connectors with your hand plus one-eighth turn.
(22) Make sure that the harness (30) is correctly installed on the engine.
(23) TORQUE the bolts (12) and (42) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
. (24) TORQUE the bolts (37) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
. (25) Close the line blocks (35) and tighten the captive bolts.
(26) Tighten the captive screws on the flip-lock clamps (5).
END SPIB NO. CFM02255MW1
(27) On the top left side of the engine, connect the electrical connectors 4100KS-A and 4100KS-B to the thrust reverser junction box. Tighten the connectors with your hand plus one-eighth turn.
(28) Attach the harness (30) to the bracket with the clamp (50) and the bolt (45).
(29) TORQUE the bolt (45) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
. (30) Put the harness into the flip-lock clamps (5) and tighten the captive screws.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 71-51-43-861-051-A ** ON A/C NOT FOR ALL Subtask 71-51-43-860-057-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CVR/SPLY | 2RK | E14 |
| 49VU | COM/CVR/CTL | 4RK | E13 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | ENGINE/1 AND 2/IGN/SYS A | 1JH | A03 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | ANTI ICE/RAIN/RPLNT/CAPT | 1DB1 | D01 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CVR/SPLY | 23RK | E14 |
| 49VU | COM/CVR/CTL | 26RK | E13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | RCDR/DFDR | 7TU | K16 |
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| 122VU | ANTI ICE/WINDOWS/R | 4DG2 | W14 |
| 122VU | ANTI ICE/WINDOWS/L | 4DG1 | X14 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | ANTI ICE/RAIN/RPLNT/F/O | 1DB2 | W11 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | ENGINE/1/FIRE DET/LOOP A | 7WD1 | A06 |
| 49VU | ENGINE/1/FADEC A/AND EIU 1 | 2KS1 | A04 |
| 121VU | ENGINE/IGN/ENG1/SYS B | 3JH1 | P41 |
| 121VU | ENGINE/IGN/ENG1/SYS A BAT | 2JH1 | P39 |
| 121VU | ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B | 2WE1 | Q44 |
| 121VU | ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A | 1WE1 | Q43 |
| 121VU | ENGINE/ENG1/FIRE DET/LOOP B | 8WD1 | Q38 |
| 121VU | ENGINE/ENG1/FADEC B/AND EIU 1 | 4KS1 | R41 |
| 122VU | ELEC/GCU/1 | 2XU1 | T26 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 49VU | ENGINE/2/FIRE DET/LOOP B | 8WD2 | A07 |
| 49VU | ENGINE/2/FADEC A/AND EIU 2 | 2KS2 | A05 |
| 121VU | ENGINE/IGN/ENG2/SYS B | 3JH2 | P42 |
| 121VU | ENGINE/IGN/ENG2/SYS A BAT | 2JH2 | P40 |
| 121VU | ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B | 2WE2 | Q42 |
| 121VU | ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A | 1WE2 | Q41 |
| 121VU | ENGINE/ENG2/FADEC B | 4KS2 | Q40 |
| 121VU | ENGINE/ENG2/FIRE DET/LOOP A | 7WD2 | Q39 |
| 122VU | ELEC/GCU/2 | 2XU2 | T27 |
D. Do the EIS start procedure (for the lower display of the ECAM system only). (Ref. AMM TASK 31-60-00-860-001).
Subtask 71-51-43-710-050-A ** ON A/C NOT FOR ALL 5. Close-upSubtask 71-51-43-862-051-A ** ON A/C NOT FOR ALL Subtask 71-51-43-410-054-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowls: (Ref. AMM TASK 71-13-00-410-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowls: (Ref. AMM TASK 71-13-00-410-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).