W DOC AIRBUS | AMM A320F

Removal of the ECU (Channel B) Harness [CFMB]


TASK 71-51-43-000-047-A
Removal of the ECU (Channel B) Harness


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
ZONE: 400
FIN: 4212KS ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
No specific
AR
COVER - PROTECTION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-B
Opening of the Fan Cowl Doors
3. Job Set-up
Subtask 71-51-43-941-057-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 71-51-43-865-071-A ** ON A/C NOT FOR ALL
WARNING: OPEN THE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3) BEFORE ENG1(2)FADEC A and EIU 1(2) C/B'S 2KS1 AND 2KS2. IF YOU DO NOT OBEY THIS SEQUENCE:
  • THE PROBES WILL BECOME TOO HOT.
  • THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUCOM/CVR/SPLY2RKE14
49VUCOM/CVR/CTL4RKE13
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PITOT/13DA1D02
** ON A/C NOT FOR ALL
49VUANTI ICE/RAIN/RPLNT/CAPT1DB1D01
** ON A/C NOT FOR ALL
49VUCOM/CVR/SPLY23RKE14
49VUCOM/CVR/CTL26RKE13
** ON A/C NOT FOR ALL
121VURCDR/DFDR7TUK16
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUANTI ICE/WINDOWS/R4DG2W14
122VUANTI ICE/WINDOWS/L4DG1X14
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
** ON A/C NOT FOR ALL
122VUANTI ICE/RAIN/RPLNT/F/O1DB2W11
** ON A/C NOT FOR ALL
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
FOR FIN: 1000EM1 (ENGINE1)
49VUENGINE/1/FIRE DET/LOOP A7WD1A06
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1/FIRE DET/LOOP B8WD1Q38
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
122VUELEC/GCU/12XU1T26
FOR FIN: 1000EM2 (ENGINE2)
49VUENGINE/2/FIRE DET/LOOP B8WD2A07
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
121VUENGINE/ENG2/FADEC B4KS2Q40
121VUENGINE/ENG2/FIRE DET/LOOP A7WD2Q39
122VUELEC/GCU/22XU2T27
Subtask 71-51-43-010-060-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
     (a) FOR [1000EM1] (ENGINE-1)
437AL, 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL, 448AR.
   (2) Put the ACCESS PLATFORM 1M(3 FT) in position.
4. Procedure
Subtask 71-51-43-020-057-A ** ON A/C NOT FOR ALL
A. Removal of the Electronic Control Unit (ECU) (Channel B) Harness
NOTE: To open the flip-lock clamps and line blocks, turn the captive screws or captive bolts 1/4 turn counterclockwise to disengage the cam nuts.
NOTE: Loosely attach the clamp(s), anti-rotation lug(s) if applicable, and bolt(s) to the brackets from which they were removed to make it easier for installation.
   (1) Disconnect electrical connectors 403VC-A and 407VC-A from the pylon junction box.
   (2) Disconnect electrical connector 4003VC-A from the junction box.
   (3) Open the flip-lock clamps (10) and (15) that attach the harness (5) to the brackets. Remove the harness from the clamps.

BEFORE SPIB NO. CFM02255MW1

   (4) Open the line blocks (20) and (25) that attach the harness (5) to the brackets at station 167.
   (5) Open the line blocks (30) that attach the harness (5) to the brackets at station 174.
   (6) Open the line blocks (35) that attach the harness (5) to the brackets at stations 176, 185, and 191.
   (7) If necessary remove the rubber supports from the line blocks. Remove the harness (5) from the rubber supports.
   (8) Remove the bolts (40) and nuts (45) that attach the clamps (50) to the bracket at station 199. Remove the clamps from the harness (5).
   (9) Open the line blocks (25) and (65) that attach the harness (5) to the brackets.
   (10) If necessary, remove the rubber supports from the line blocks. Remove the harness (5) from the rubber supports.

CONFIG-1

   (11) Open the flip-lock clamp (55) near ignition exciter B.

END OF CONFIG-1

CONFIG-2

   (12) Open the flip-lock clamp (60) near ignition exciter B.

END OF CONFIG-2

   (13) Disconnect electrical connector 4000JH2-A from ignition exciter B.
   (14) Disconnect electrical connectors 4000KS-J2 and 4000KS-J4 from the ECU.
   (15) Open the two flip-lock clamps (60) attached to the brackets at station 191. Remove the harness (5) from the clamps.
   (16) Open the flip-lock clamp (80) attached to the bracket at station 191. Remove the harness (5) from the clamp.
   (17) Open the two flip-lock clamps (55) attached to the brackets at station 191. Remove the harness (5) from the clamps.
   (18) Disconnect electrical connector 4000EV-C from the fan speed sensor (N1).

AFTER SPIB NO. CFM02255MW1

   (19) Remove the clamps and bolts (22) that attach the harness (5) to the brackets at station 167.
   (20) Remove the clamps, bolt and anti-rotation lug (23) that attach the harness (5) to the brackets at station 167.
   (21) Remove the clamps, bolt and anti-rotation lug (27) that attach the harness (5) to the brackets at station 167.
   (22) Remove the clamps and bolt (32) that attach the harness (5) to the brackets at station 174.
   (23) Remove the clamps, bolts and anti-rotation lugs (37) that attach the harness (5) to the brackets at station 176, 185 and 191.
   (24) Remove the bolts (40) and nuts (45) that attach the clamps (50) to the bracket at station 199. Remove the clamps from the harness (5).
   (25) Open the line block (25) that attaches the harness (5) to the bracket.
   (26) Remove the clamps and bolt (28) that attach the harness (5) to the bracket.
   (27) Remove the clamps and bolt (67) that attach the harness (5) to the bracket.
   (28) Remove the clamps, bolt and anti-rotation lug (68) that attach the harness (5) to the bracket.
   (29) If necessary, remove the rubber supports from the line block. Remove the harness (5) from the rubber support.
   (30) Remove the clamp, bolt and anti-rotation lug (57) near ignition exciter B.
   (31) Disconnect electrical connector 4000JH2-A from ignition exciter B.
   (32) Disconnect electrical connectors 4000KS-J2 and 4000KS-J4 from the ECU.
   (33) Remove the clamps and bolts (62) that attach the harness (5) to the brackets at station 191. Remove the harness (5) from the clamps.
   (34) Remove the clamp and bolt (82) that attach the harness (5) to the bracket at station 191. Remove the harness (5) from the clamps.
   (35) Open the flip-lock clamp (55) attached to the bracket at station 191. Remove the harness (5) from the clamp.
   (36) Remove the clamp and bolt (57) that attach the harness (5) to the brackets at station 191. Remove the harness (5) from the clamp.
   (37) Disconnect electrical connector 4000EV-C from the fan speed sensor (N1).

END OF SPIB NO. CFM02255MW1

PRE SB RA32171-6

   (38) Open the flip-lock clamp (55) attached to the bracket at station 185. Remove the harness (5) from the clamp.

POST SB RA32171-6

   (39) Remove the bolt (40) that attaches the clamp (50) to the bracket at station 185. Remove the clamp (50) from the harness (5).

END OF SB RA32171-6

   (40) Remove the bolts (70) and the nuts (75) that attach the two clamps (50) to the starter bracket.
   (41) Remove the bolt (40) and nut (45) that attach the clamp (50) to the gearbox bracket.
   (42) Remove the bolt (85) and nut (90) that attach the clamp (50) and the fire detector clamp to the gearbox bracket. (See Detail C).
   (43) Disconnect electrical connector 4001EV-C from the gas generator speed sensor (N2).
   (44) Remove the electrical harness (5) from the engine.
   (45) Put the COVER - PROTECTION on the electrical connectors.
[Rev.10 from 2021] 2026.04.02 07:30:19 UTC