Continuity Check of the Power Plant Wire Harness [CFMB]
TASK 71-50-00-280-001-A
Continuity Check of the Power Plant Wire Harness
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 71-50-00-941-051-A ** ON A/C NOT FOR ALL
Subtask 71-50-00-280-050-A ** ON A/C NOT FOR ALL
(2) Connect the leads of the MULTIMETER MODEL 160B or OHMMETER MODEL 260 to each end of the wire and check for continuity.
(3) Each circuit examined must have continuity from one end of the wire to the other end of the wire.
(4) Defective circuits must be repaired ESPM 205000.
5. Close-up
Subtask 71-50-00-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:32:23 UTC
Continuity Check of the Power Plant Wire Harness
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | MULTIMETER MODEL 160B |
| No specific | AR | OHMMETER MODEL 260 |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
| ESPM 205000 |
Subtask 71-50-00-941-051-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 71-50-00-010-052-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(4) Put the ACCESS PLATFORM 1M(3 FT) in position.
Subtask 71-50-00-040-051-A ** ON A/C NOT FOR ALL Subtask 71-50-00-010-053-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(4) Put the ACCESS PLATFORM 1M(3 FT) in position.
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 71-50-00-280-050-A ** ON A/C NOT FOR ALL
CAUTION:
DO NOT CAUSE DAMAGE TO CONNECTOR PINS WHEN YOU DO CONTINUITY CHECKS. DAMAGED PINS CAN BECOME LOOSE AND CAN THUS INTERMITTENTLY PREVENT CORRECT CONTINUITY.
A. Continuity Check of the Power Plant Wire Harness NOTE: You should do a continuity check on wires and connectors that could be unsatisfactory.
(1) Disconnect the connectors at each end of the wire harness which contains the unsatisfactory wire. (2) Connect the leads of the MULTIMETER MODEL 160B or OHMMETER MODEL 260 to each end of the wire and check for continuity.
(3) Each circuit examined must have continuity from one end of the wire to the other end of the wire.
(4) Defective circuits must be repaired ESPM 205000.
Subtask 71-50-00-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(3) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(4) FOR [1000EM2] (ENGINE-2)
461AL 462AR
(5) Remove the access platform(s).
Subtask 71-50-00-440-051-A ** ON A/C NOT FOR ALL Subtask 71-50-00-410-053-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(3) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(4) FOR [1000EM2] (ENGINE-2)
461AL 462AR
(5) Remove the access platform(s).