Detailed Inspection of Disassembled Forward Engine Mount Installation Including Mating Surfaces [CFMB]
TASK 71-21-11-210-042-B
Detailed Inspection of Disassembled Forward Engine Mount Installation Including Mating Surfaces
Refer to the MPD TASK: 712111-02
DETAILED INSPECTION OF DISASSEMBLED FORWARD ENGINE MOUNT INSTALLATION INCLUDING MATING SURFACES.
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 71-21-11-020-060-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 71-21-11-210-054-A ** ON A/C NOT FOR ALL
Subtask 71-21-11-410-064-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:32:20 UTC
Detailed Inspection of Disassembled Forward Engine Mount Installation Including Mating Surfaces
ZONE: 400
1. Reason for the JobRefer to the MPD TASK: 712111-02
DETAILED INSPECTION OF DISASSEMBLED FORWARD ENGINE MOUNT INSTALLATION INCLUDING MATING SURFACES.
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 400 | POWER PLANT, NACELLES AND PYLONS |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-21-11-000-041-A | Removal of the Forward Engine Mount System |
| TASK 71-21-11-400-041-A | Installation of the Forward Engine Mount System |
Subtask 71-21-11-020-060-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 71-21-11-210-054-A ** ON A/C NOT FOR ALL
A. Do a detailed visual inspection of the forward engine mount as per ROHR CMM 712108 .
5. Close-upNOTE: Inspection is done with engine mount disassembled.
Subtask 71-21-11-410-064-A ** ON A/C NOT FOR ALL