Installation of the Rib 2 Surge Door 540AZ(640AZ) or 540BZ(640BZ)
TASK 57-27-12-400-001-A
Installation of the Rib 2 Surge Door 540AZ(640AZ) or 540BZ(640BZ)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 57-27-12-941-052-A ** ON A/C NOT FOR ALL
Subtask 57-27-12-560-050-A ** ON A/C NOT FOR ALL
Subtask 57-27-12-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:30:53 UTC
Installation of the Rib 2 Surge Door 540AZ(640AZ) or 540BZ(640BZ)
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 1 | SCRAPER - NON METALLIC |
| No specific | AR | WARNING NOTICE(S) |
| 98D27803500001 | 1 | LOCKING TOOL ZERO POS |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05EML9) | Epoxy Adhesive-- - Legacy 1 |
| (Material No.05JBB9) | Contact Adhesive-Rubber & Plastic Bonding Nitrile base - |
| (Material No.06AEA1) | Polysulfide Sealant-Low Adhesion Brushable - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 540 | FUEL TANK |
| 640 | FUEL TANK |
| 540AB, 640AB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 23 | SEAL | AIPC 57-27-12-01-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-10-00-910-001-A | Safety Procedures When You Do Work in a Fuel Tank |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
Subtask 57-27-12-941-052-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Make sure that you obeyed the fuel safety procedures when you do work in the fuel tank (Ref. AMM TASK 28-10-00-910-001).
(2) Make sure that the safety barriers are in position.
(3) Make sure that the 98D27803500001 LOCKING TOOL ZERO POS is correctly installed on the slats and flaps control lever.
(4) Make sure that the WARNING NOTICE(S) (is) are in position in the cockpit, on the center pedestal, to tell persons not to operate the slats and flaps control lever.
Subtask 57-27-12-860-051-A ** ON A/C NOT FOR ALL (1) Make sure that you obeyed the fuel safety procedures when you do work in the fuel tank (Ref. AMM TASK 28-10-00-910-001).
(2) Make sure that the safety barriers are in position.
(3) Make sure that the 98D27803500001 LOCKING TOOL ZERO POS is correctly installed on the slats and flaps control lever.
(4) Make sure that the WARNING NOTICE(S) (is) are in position in the cockpit, on the center pedestal, to tell persons not to operate the slats and flaps control lever.
B. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below the wing fuel tank, at zone 540(640).
(2) Make sure that the access panel is removed (Ref. AMM TASK 57-27-11-000-001):
Subtask 57-27-12-860-051-B (1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below the wing fuel tank, at zone 540(640).
(2) Make sure that the access panel is removed (Ref. AMM TASK 57-27-11-000-001):
DELETED
4. ProcedureSubtask 57-27-12-560-050-A ** ON A/C NOT FOR ALL
A. Preparation of a Replacement Component
(1) Clean the interfaces of the hinges (18) and the surge door (17) with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Apply a layer of Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) :
(4) Tighten the nuts (19).
(5) Clean the surfaces that follow with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) :
Subtask 57-27-12-420-051-A ** ON A/C NOT FOR ALL (1) Clean the interfaces of the hinges (18) and the surge door (17) with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Apply a layer of Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) :
- On the interfaces of the hinges (18) and the surge door (17)
- Below the heads and on the plain part of the bolts (15).
(4) Tighten the nuts (19).
(5) Clean the surfaces that follow with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) :
- The heads of the bolts (15) and the area around them
- The nuts (19) and the threaded ends of the bolts (15).
- The heads of the bolts (15)
- The nuts (19) and the threaded ends of the bolts (15).
B. Preparation for Installation
(1) Clean the component interfaces and the adjacent areas with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Make sure that the seal (23) is in good condition.
(5) If the seal (23) is not in good condition, replace it as follows:
(a) Remove the seal (23) with the SCRAPER - NON METALLIC.
(b) Clean the area with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(c) Apply the Contact Adhesive-Rubber & Plastic Bonding Nitrile base - (Material No.05JBB9) on the mating surfaces of the seal (23) and the surge door (17).
(d) Install the new AIPC 57-27-12-01-010 SEAL (23).
1 Make sure that the textured side of the seal (23) is on the flat side of the surge door (17).
Subtask 57-27-12-420-051-B ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent areas with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Make sure that the seal (23) is in good condition.
(5) If the seal (23) is not in good condition, replace it as follows:
(a) Remove the seal (23) with the SCRAPER - NON METALLIC.
(b) Clean the area with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(c) Apply the Contact Adhesive-Rubber & Plastic Bonding Nitrile base - (Material No.05JBB9) on the mating surfaces of the seal (23) and the surge door (17).
(d) Install the new AIPC 57-27-12-01-010 SEAL (23).
1 Make sure that the textured side of the seal (23) is on the flat side of the surge door (17).
B. Preparation for Installation
(1) Clean the component interfaces and the adjacent areas with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Make sure that the seal (23) is in good condition.
(5) If the seal (23) is not in good condition, replace it as follows:
(a) Remove the seal (23) with the SCRAPER - NON METALLIC.
(b) Clean the area with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(c) Apply the Epoxy Adhesive-- - Legacy 1 (Material No.05EML9) on the mating surfaces of the seal (23) and the surge door (17).
(d) Install the new AIPC 57-27-12-01-010 SEAL (23).
1 Make sure that the seal (23) is on the flat side of the surge door (17).
Subtask 57-27-12-420-051-C (1) Clean the component interfaces and the adjacent areas with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Make sure that the seal (23) is in good condition.
(5) If the seal (23) is not in good condition, replace it as follows:
(a) Remove the seal (23) with the SCRAPER - NON METALLIC.
(b) Clean the area with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(c) Apply the Epoxy Adhesive-- - Legacy 1 (Material No.05EML9) on the mating surfaces of the seal (23) and the surge door (17).
(d) Install the new AIPC 57-27-12-01-010 SEAL (23).
1 Make sure that the seal (23) is on the flat side of the surge door (17).
DELETED
Subtask 57-27-12-420-050-A ** ON A/C NOT FOR ALL C. Installation of the Rib 2 Surge Door 540AZ(640AZ) or 540BZ(640BZ)
(1) If you removed the springs (11) from the brackets (12), install them as follows:
(a) Install the sleeves (16), the springs (11), the bobbins (20), the washers (21), the bolts (22), the washers (14) and the nuts (13).
(b) Tighten the nuts (13).
(2) Install the surge door (17) as follows:
(a) Put the surge door (17) in position on the brackets (3).
(b) Install the washers (2), the pins (4) and the nuts (1) on the brackets (3).
(c) Tighten the nuts (1).
(d) Make sure that the surge door (17) moves freely on the pins (4) before the installation of the springs (11).
1 Install the sleeves (8), the springs (11), the bobbins (7), the washers (6), the bolts (5), the washers (9) and the nuts (10).
2 Tighten the nuts (10).
Subtask 57-27-12-420-050-B (1) If you removed the springs (11) from the brackets (12), install them as follows:
(a) Install the sleeves (16), the springs (11), the bobbins (20), the washers (21), the bolts (22), the washers (14) and the nuts (13).
(b) Tighten the nuts (13).
(2) Install the surge door (17) as follows:
(a) Put the surge door (17) in position on the brackets (3).
(b) Install the washers (2), the pins (4) and the nuts (1) on the brackets (3).
(c) Tighten the nuts (1).
(d) Make sure that the surge door (17) moves freely on the pins (4) before the installation of the springs (11).
WARNING:
BE CAREFUL WHEN YOU REMOVE OR INSTALL THE SPRING. THE TENSION IN THE SPRING CAN CAUSE INJURY TO PERSONS.
(e) Install the springs (11) on the hinges (18) as follows:1 Install the sleeves (8), the springs (11), the bobbins (7), the washers (6), the bolts (5), the washers (9) and the nuts (10).
2 Tighten the nuts (10).
DELETED
5. Close-upSubtask 57-27-12-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel (Ref. AMM TASK 57-27-11-400-001):
Subtask 57-27-12-410-050-B (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel (Ref. AMM TASK 57-27-11-400-001):
DELETED
Subtask 57-27-12-650-051-A DELETED
Subtask 57-27-12-941-053-A ** ON A/C NOT FOR ALL C. Removal of Equipment
(1) Remove the SAFETY BARRIERS.
(2) Remove the access platform(s).
(3) Remove the 98D27803500001 LOCKING TOOL ZERO POS from the slats and flaps control lever.
(4) Remove the WARNING NOTICE(S).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the SAFETY BARRIERS.
(2) Remove the access platform(s).
(3) Remove the 98D27803500001 LOCKING TOOL ZERO POS from the slats and flaps control lever.
(4) Remove the WARNING NOTICE(S).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Seal of the Rib 2 Surge Door 540AZ(640AZ) or 540BZ(640BZ)