W DOC AIRBUS | AMM A320F

Special Detailed Inspection (HFEC and US) of Outer Wing, Bottom Skin Lower Surface at Fuel Pump Apertures and Adjacent Holes between Rib 1 and Rib 2


TASK 57-20-00-280-803-A
Special Detailed Inspection (HFEC and US) of Outer Wing, Bottom Skin Lower Surface at Fuel Pump Apertures and Adjacent Holes between Rib 1 and Rib 2


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
CAUTION: DO NOT APPLY TEMPORARY PROTECTION SYSTEM (TPS) ON THE INSPECTION AREA. IF YOU APPLY TPS ON THE INSPECTION AREA, YOU CAN CAUSE DAMAGE TO THE AIRCRAFT.
ZONE: 540
ZONE: 640
1. Reason for the Job
Refer to the MPD TASK: 572054-03
SPECIAL DETAILED INSPECTION (HFEC AND US) OF OUTER WING, BOTTOM SKIN LOWER SURFACE AT FUEL PUMP APERTURES AND ADJACENT HOLES BETWEEN RIB 1 AND RIB 2.
NOTE: The effectivity of this task is "ALL". To know if this task is applicable to your aircraft, refer to the MPD task applicability.
NOTE: To do this task, fuel pumps 21QA(26QA) and 25QA(22QA) must be removed.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)
No specific
1
AIR SOURCE FILTERED, DRY
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
98D27803500001
1
LOCKING TOOL ZERO POS
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
540
FUEL TANK
640
FUEL TANK
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 28-21-51-000-001-A
Removal of the Fuel Pumps
TASK 28-21-51-400-001-A
Installation of the Fuel Pumps
TASK 51-78-00-916-001-A
Application of Temporary Protection System (TPS)
SRM 511100
SRM 512200
NTM 572054
SRM 512300
(for corrective action)
SRM 512400
(for corrective action)
3. Job Set-up
Subtask 57-20-00-941-117-A
A. Safety Precautions
WARNING: OBEY THE FUEL SAFETY PROCEDURES.
   (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
   (2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
   (3) Install the 98D27803500001 LOCKING TOOL ZERO POS on the flap/slat control lever.
   (4) Put the WARNING NOTICE(S) in position in the cockpit to tell persons not to operate the flaps or the slats.
Subtask 57-20-00-010-121-A
B. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT) in position at zone 540(640).
   (2) Remove fuel pumps 21QA(26QA) and 25QA(22QA) (Ref. AMM TASK 28-21-51-000-001).
Subtask 57-20-00-110-106-A
C. Preparation of the Inspection Area
   (1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
WARNING: WHEN YOU USE COMPRESSED AIR:
  • USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
  • DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
LOOSE PARTICLES AND/OR HIGH PRESSURE AIR CAN CAUSE INJURY.
   (2) If not, clean the edges of the two fuel pump openings with the clean Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the AIR SOURCE FILTERED, DRY.
   (3) Make sure that there is no TPS layer and if there is a TPS layer, remove it (Ref. AMM TASK 51-78-00-916-001).
   (4) Remove the sealant and/or paint from the inspection area if this is necessary for the Nondestructive Testing Manual (NTM) task.
4. Procedure
Subtask 57-20-00-280-062-A
A. Inspection
   (1) Do a special detailed inspection (HFEC and US) of the bottom skin lower-surface of the outer wing for damage or discontinuities. Do this inspection at the fuel pump openings and the adjacent holes, between rib 1 and rib 2 NTM 572054.
   (2) Make a report of the damage after the NTM inspection:
     (a) Corrosion damage:
If you find corrosion, refer to the Structural Repair Manual ( SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
     (b) Other damage (scratches, cracks, gouges, dents, creases):
If you find this type of damage, refer to the Structural Repair Manual ( SRM 511100) for damage types, classification and corrective action.
Subtask 57-20-00-370-050-A
B. Sealant or Paint Application
   (1) If the NTM procedure asked to remove the sealant and/or paint from the inspection area, apply sealant ( SRM 512400) or paint ( SRM 512300) on the inspection area.
5. Close-up
Subtask 57-20-00-410-117-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install fuel pumps 21QA(26QA) and 25QA(22QA) (Ref. AMM TASK 28-21-51-400-001).
Subtask 57-20-00-942-118-A
B. Removal of Equipment
   (1) Remove the access platform(s).
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the 98D27803500001 LOCKING TOOL ZERO POS from the flap/slat control lever.
   (4) Remove the SAFETY BARRIERS.
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.02 06:30:38 UTC